Construction Economics

       The PROJECT








Construction industry plays a vital role in the economy of any nation. It employs largest number of labour, materials and financial resources. Hence the necessity for the optimum use of these scarce resources. In addition, the construction activity precedes any social, business recreational activities. These construction economics has developed into a separate field distinct from design and construction.  This has led to the genesis of modern concept of quantity surveying functions. The quantity surveyor is called upon to render advice to the employer on various aspects of economy in construction from the stage of conception to completion of the project and even during the life cycle period. The employer will look for the value for the money spent by him. The Engineer/Quantity surveyor  therefore need to possess a thorough knowledge of the project, market conditions, availability of vendors and contractors to render his timely and independent advice to the employer.


What is construction Economics?
              Economics  is derived from the Greek word ‘Oikonomia’ (Oikos = house + Nomos = laws) meaning managing the home. The definition of economics is the “Social science that studies the production, distribution and consumption of goods and services”. The modern definition according to Lionel Robbins in 1932 states economics as a  “science which studies human behavior as a relationship between ends and scarce means which have alternate uses”.
            Construction economics is a branch of general economics. It consists of application of techniques and expertise of economics to the particular area of construction industry. Construction economics is concerned with man’s needs for shelter and the suitable and appropriate conditions in which to work and live. It seeks to ensure the efficient use of available resources and to increase the rate of growth of construction in the most efficient manner.

 Construction economics include study of the following:
Ø  Client’s requirements :
        a)  Structure meets the client’s needs
        b)  Design is within the available funds
        c)  Building is available on the specified date
        d)  Final cost closely resembles the estimate
        e)  Quality / safety ensured
Ø  How the new construction affects the surrounding areas. This will consider aspects of planning, general amenities affected
Ø  The relationship of space and shape. Influence of design on cost
Ø  Assessment of initial cost estimate that is sufficiently accurate which will be useful for comparison throughout the building process
Ø  The reasons and methods of controlling costs. The methods adopted will vary according to the nature of project. The methods adopted should be sufficiently accurate but flexible enough to suit client’s requirements
Ø  Estimating the life of buildings and materials. The emphasis on initial costs has moved to costs in use
      Other important aspects to be considered:
§  Role of surveyors, engineers and builders employed in the industry
§  Division of industry between the design and construction process
§  The size of construction industry, its relation with other industries and national economy
§  Types of developments undertaken
§  The types and sizes of construction firms, and the availability of specialist contractors
§  The variations in building costs and factors that influence variations, such as market conditions, regional locations
§  Physical /unique nature of the project
§  Organization of construction process
§  Method of price determination


Cost Information:
a)      Price books / Current Market rate data – These data needs to be updated regularly to take price escalations into account
b)      Monthly cost data – Cost information on cost of materials, labour rates, indices, market indicators and other information relevant to construction. Research has shown that in the periods of high escalation, the prices can change even in a month, during Govt. Budget proposals, policy changes of Govt.
c)      Construction cost indices – In Britain comprehensive construction cost information is supplied on reciprocal basis based on analysis of completed projects. In addition it also provides cost indices, cost studies, cost trends, monthly briefings. However in India such information is maintained by concerned organizations. RBI/ Ministry of finance, Govt. of India publishes price indices for building materials, fuel monthly/ Quarterly .
d)       Construction cost price indices – Labour rates are fixed by labour commissioners of respective states. Many companies are now a days maintaining cost data of completed projects in their archives which will be useful for determining cost of future projects.
e)      Priced bill of quantities – They provide a wealth of information. However such data must be carefully analyzed because


         Cost planning and cost comparison:
     Cost Planning: The aim is to inform the client on the economic consequences   of various designs to enable him to select the most appropriate solution. Following are some of the aspects of cost planning.
a)                  Planning Efficiency – Although length of bridge is similar the depth of foundations, height of piers and spans are different. The details of deck slab are different.
b)                   Constructional details – In order to advise the client, the planner will have to undertake cost studies of sensitive elements (Elements where alternatives make large change), technology, methods of construction. This will involve time and money.


Economics of Quality: ‘M’ factors affecting Quality
     Markets: Comparability between standards provided by different firms
     Men: Single most important factor in achieving quality, i.e. having right men
     Money: Quality costs money
     Management: It is the function of management to set company’s quality policy
     Materials: Specified correctly, properly delivered and checked at site, stored and used
     Methods: The method specified must be capable of being executed in practice to the tolerance and finish required.
     Machines: Selection of correct machine for the work being carried out to work efficiently


   Construction economics is concerned with making efficient use of limited resources to maximize output and satisfy greatest possible number of wants.
   Productivity of Economy:
Ø  Quantity & Quality of natural and manmade resources
Ø  Quality and extent of education and training of labour force
Ø  Levels of expectation, motivation and well being
Ø  Commitment to research and development

   Causes of Inefficiency in Construction Industry:
Ø  Industry demonstrates poor safety record
Ø  No real culture from learning from previous projects
Ø  Poor level of investment into R&D
Ø  Technology not used widely enough
    Construction Industry has four distinct Qualities:
Ø  Physical nature of the product is large, heavy and expensive and often one off
Ø  Dominated by large number of relatively small firms spread over vast area
Ø  Demand for activity directly determined by general state of economy
Ø  Method of price determination is usually complex due to tendering process used in various stages. As a result of poor management, construction firms may have cost over runs (20-30%). Clients fell short of revenues by 30-40%.
    Sustainable Construction:
Ø  Efficient use of resources
Ø  Effective protection of environment
Ø  Economic growth
Ø  Social progress that meets needs of every one

   Construction process is a world of as if:
Ø  As if client knew what he wanted when he commissions the structure from a designer
Ø  As if the designer was in a position to advise the client on the best value for money he could obtain from the market
Ø  As if the contractual procedures were devised to ensure that the client could get the best possible deal from the profession from the market place
Ø  As if the manufacturer of construction materials and components know in advance what is expected of him and geared his production to such expectation
Ø  As if the contractor knows how his resources were used, was in a position to control them and was able to use this experience on his next project (Complex, Fragmented and Conservative nature). Construction economics should therefore favour models that prioritize strategies and improve sustainability, competitiveness, productivity and value to clients.
Ø   Investment criteria: (Discounting Methods)
Ø  Net present value (NPV): It is the sum of the present values of all cash flows-positive as well as negative-that are expected to occur over the life cycle period of the project.


   Investment criteria: (Discounting Methods):

   Benefit cost ratio:

                                                Present value of benefits (PVB)
   Benefit cost ration (BCR)= -----------------------------------
                                                Initial Investment (I)


   Net benefit cost ratio (NCBR)= BCR – 1
   Criteria:
   When BCR                 Or NBCR            Rule is
     > 1                                > 0                  Accept
     = 1                                = 0                  Indifferent
     < 1                                < 0                  Reject


   Internal rate of return (IRR): It is the discount rate which makes its NPV equal to zero. Put differently it is the discount   rate which equates the present     value of future cash flows with the initial investment.






Urgency: Projects that are deemed to be more urgent get priority over projects that are regarded as less urgent.
E.g. Replacement of a machine that has failed and the major work is stalled.
Payback period: It is the length of time required to recover the initial investment on the project






Accounting rate of return: The accounting rate of return, also referred to as average rate of return on investment, is a measure of profitability which relates to investment, both measured in accounting terms.








     Value Engineering and Value management:
Ø  Value management is a strategy for identifying the project that provides the best value for money through the best use of limited resources that are available
Ø  As per Lawrence  De Miles, GEC USA, the originator of value engineering, ‘It is an organized approach to providing the necessary functions at the lowest cost’

      Some of the questions asked in value management are:
1.      What is it?
2.      What does it do?
3.      What is it worth?
4.      What does it cost?
5.      What else will do?
6.      What does that cost?
      In the development of value management following are encouraged:
§  Protect those in the group who are vulnerable
§  Listen to other’s point of view
§  Eliminate status or rank
§  Value the learning in mistakes
§  Set up win-wins
§  Share the risk
§  Assume it can be done
§  Take on faith


     Cost Studies: Cost sensitivity -  The cost sensitivity of an element is dependent on the cost of the element to the total cost of the building. For any element to be cost sensitive, any change in its cost must significantly affect the initial building cost. The element is  cost sensitive as regards quality and performance only where the quantity factor is high and how sensitive depends on combined costs of other elements.

     Development Economics: Various sources of funds:
a)      Owner’s capital – This includes retained earnings in the form of profits, and is the most economical source, should it be available. The use of trading funds, deferred expenses for goods and materials or money set aside for taxation purposes may also be available in the short term.
b)      Bank overdraft – This is unlikely to be available as a source of finance for building development. This may be available for bridging purposes. High rates of interest are generally charged by banks.
c)      Loans – This is a long term loan at a lower rate of interest. It is common for small firms to obtain this form of loan from banks. However a large organization may choose an insurance company, or a financial corporation.
d)     Shares – Property companies are able to raise capital by selling shares to purchasers who then receive a share of the profits when distributed. There are two types of shares.
e)      Hire purchase and leasing – If a firm has insufficient capital for both equipment and development, it can obtain the capital by hire purchase, which is in effect a loan, and so as to release its capital for development. The firm may choose to lease the equipment for a minimum period, with an option to purchase at the end of the time period.
f)       Installment finance – Major building works are paid for on the basis of interim payments. The price of the project is paid for on an installment basis, usually representing 90% of the value of work complete. Payment by this way helps to reduce the borrowing requirements. The developer, where he is not the contractor, may be able to offset these sums by either forward selling or pre-selling methods, where monies are received in advance of completion.

Note:
      Preferential shares: These carry a fixed rate of interest which shall be paid irrespective of whether the company makes profit or not.
     Equity shares – The profits/ dividend are paid to the    purchasers equally only after the dues to preferential shares/ debentures are paid in full. Even if the company goes into liquidation, all the dues of debenture/ preferential holders are paid in the first instance.
     Debentures – These are essentially  loans to the company at a fixed rate of interest and do not allow their holders to vote. They must be paid first irrespective of whether the company makes profit or loss.


      Life Cycle Costing:
1.      Understand the principles that affect the buildings life
2.      Identify the factors that affect the physical deterioration of buildings
3.      Consider the different forms of obsolescence that affect property
4.      Recognize the variability in the lives of building components
5.      Identify the problems that are inherent with component life data
6.      Understand the relationship between inflation, interest rates and discount rates
7.      Recognize the significance of taxation on the whole life costing calculations


      Lean Construction:
      Eliminate waste: It can include mistakes, working out sequence, redundant activities and movement, delayed or premature inputs and products & services that don’t meet customer needs.
      Primary focus is on moving closer to providing product that customer really wants by understanding the process  including identifying waste within it and eliminating step by step
      Designing is identifying the right product in terms of customer needs and then designing it correctly as coherent buildable products and not just styling the exteriors. Design development target shall include reducing design changes and process iterations.
      Precisely specify value from the perspective of ultimate customer. Clearly identify the process that delivers what the customer values and eliminate all non value adding steps.
      Pursue perfection by continuous improvement


32 comments:

  1. Howdy just wanted to give you a quick heads up. The text in
    your article seem to be running off the screen in Chrome.

    I'm not sure if this is a format issue or something to do with web browser compatibility but I figured I'd
    post to let you know. The layout look great though! Hope you get the issue solved soon.
    Cheers

    Here is my web-site; owning a bloodhound

    ReplyDelete
  2. I am really pleased to read this web site posts which includes lots of useful facts,
    thanks for providing these information.

    Also visit my web-site professional baseball

    ReplyDelete
  3. Howdy! Do you use Twitter? I'd like to follow you if that would be ok. I'm definitely enjoying your blog and look
    forward to new updates.

    my homepage: used s2000 hardtop for sale

    ReplyDelete
  4. Excellent post. I absolutely love this site. Stick with it!


    my web page :: bypass pruners

    ReplyDelete
  5. Construction today would take a very long time if not for construction equipment. Take for example the cement truck. آرین سازه

    ReplyDelete
  6. Helpful content please add some more content on Procurement in Construction

    ReplyDelete
  7. Informative post about building services, this is really useful as it is explained in a very simple manner. For those who are looking for building and renovation services Read more

    ReplyDelete
  8. When it comes to auto repair advertising for auto repairs shops most owners wonder why their advertising doesn't work. The answer is simple; because they don't know how to do it correctly... Metal Hose

    ReplyDelete
  9. Your web journal is exceptionally profitable which you have got shared here approximately welding. I appreciate your endeavors which you've got put into this article conjointly it could be a productive article for us. Thank you for sharing this article here. Pelican Paint

    ReplyDelete
  10. Quick Fix doesn’t just manufacture reliable synthetic urine. The company tacks on handy accessories so you can transport and dispense your synthetic urine sample hassle-free (or discreetly). <img class="size-full wp-image-470654 aligncenter" src="https://www.laweekly. You can contact a representative if you have questions about the product by phone or email. Additionally, Clear Choice has a money-back guarantee if you are not satisfied with the Incognito Belt or any of its other products. Visit: https://www.urineworld.com/

    ReplyDelete
  11. Construction today would take a very long time if not for construction equipment. Take for example the cement truck. جده التاريخيه

    ReplyDelete
  12. Thank you for another excellent article. Where else could anybody get that kind of info in such an ideal way of writing?
    I’ve a presentation next week, and I am on the look for such information.
    english stories gk quiz app story minds

    ReplyDelete
  13. A independent software vendor (ISV) Dynamic Netsoft is there for you with construction management on d365

    ReplyDelete
  14. If you run into plumbing problems in your home, going the DIY route may not be the wisest option. This article helps explain why contacting a plumbing professional could be your best bet. plumbers ogden utah

    ReplyDelete
  15. Construction today would take a very long time if not for construction equipment. Take for example the cement truck. crushed concrete houston

    ReplyDelete
  16. There are many different types of construction projects. How do you categorize them, and know what type of project a particular element of construction is? Here are seven different categories for construction projects. kitchen remodeling

    ReplyDelete
  17. Before you construct a house it's important that you estimate the amount of money that will spend on the project. The process of estimating the cost of construction is usually complex as you need to consider many factors in order to come up with an accurate estimate. Some of the factors that you need to consider include: general contractor San Jose CA

    ReplyDelete
  18. Some construction companies fail to consider the size of their company when choosing a new software package for project management. This article discusses the importance of being aware of the size of your company when looking for your next construction software package. kitchen remodeling

    ReplyDelete
  19. Not all car accidents are caused by negligent driving. Sometimes dangerous roadways are to blame. Poorly marked construction zones, poorly maintained roads, and other hazardous road conditions cause many accidents each year in Arizona. Construction zone accidents cause a wide range of accidents, including broken bones, spinal cord injury, brain injury, and wrongful death. concrete lansing mi

    ReplyDelete
  20. I likewise conceive thus, perfectly written post! . deck restore atlanta

    ReplyDelete
  21. “It’s always good to learn tips like you share for blog posting. As I just started posting comments for blog and facing problem of lots of rejections. I think your suggestion would be helpful for me. I will let you know if its work for me too.” Get a free quote

    ReplyDelete
  22. Methods for dilution antimicrobial susceptibility beadlets for beagles that grow aerobically—fifth edition. handyman services lansing mi

    ReplyDelete
  23. Having faulty plumbing is one of the most challenging circumstances that you can face at home. There are different kinds of plumbing issues that can come up - clogged drains, leaky faucets and sewer damages. These are serious plumbing issues that have to be tended to before they worsen. Cranbourne Landscaping

    ReplyDelete
  24. Construction is one of the most dynamic sectors of the Albanian economy, with a real growth of 14% for the recently period of 2008. Construction activity is concentrated in the major urban centers. State participation in the construction sector is mainly focused on infrastructure and engineering constructions. State financing for engineering constructions constitute 85 % of total state financed construction. Wrecker Service

    ReplyDelete
  25. Get the best Marketing Case Study help? Our team of educated Experts and writers who are provided you free plagiarism check, 100% satisfaction guarantee and many more. Our teams of experts help you get your assignments have done in no time. Get A+ grade in your academic with the best opportunity in your assignments. Our experts are highly educated and experienced. They are 24*7 available for all students. Visit now and take the best
    assignment services in Australia in the most affordable price.

    ReplyDelete
  26. Buy the best assignment offers on homework? From assignmenthelpaus.com. We can provide you Australia no 1 well research assignments content in most reasonable price. We have team of best and dedicated experts and writers who is always available for all college and university. Our talented experts always assist the student with wide range topics their assignment. They are helping you to increases your score and get best Grade in your assignments. Join us and take the best opportunity in your assignments.

    ReplyDelete
  27. Informative read! I appreciate the depth of research and the clarity of your writing. Do check this out: Australia Assignment Help

    ReplyDelete
  28. Where can I find Australia's top online assignment help? +44 7427597101
    My friend recommended me to get Assignment Help Melbourne from the Help in Assignment and I decided to get it going. I received my second assignment and I am really happy to use this writing service. Absolutely great work! For more information you can Visit your website helpinassignment. Need Help? Call Us+44 7427597101 +61 731300073 , +3532772315 .

    ReplyDelete
  29. ¿Número de teléfono de Southwest para México? +1 888 6910 320

    Tiquetes de Vuelos ofrece algunas de las asombrosas mejores y descuentos. Si tiene alguna consulta relacionada a viajar puede llamar al Numero de Telefono de Southwest Para Mexico que es +1 888 6910 320 si es de este país. No busques aquí y allá si buscas un número de teléfono del Suroeste de México Visita para reservar boletos a precio de descuento solo Visita tu sitio web tiquetesdevuelos. CONÉCTATE CON NOSOTROS USA 30 N Gould St, STE R Sheridan, WY 82801 Columbia Carrera 35#15B-35 Spc 101, Medellín, Colombia USA: +1 8886910320, Columbia 6046090440, Mexico 5599903559, Argentina 1139880294, Colombia: +576046090440 Email: care@tiquetesdevuelos.com.

    ReplyDelete

Quantity Surveyor opening at WSP

Job Title: Quantity Surveyor Job Location: Noida Business Stream: Engineering Role Summary This role presents an excellent opportunity for a...