In the present case requirement
of concrete temperature is 23° C at the time of mixing
and 27° C at the time of placing as
furnished by the customer.
The calculations for quantity of ice to be added in the form of flakes are
shown in Tables for both grades of concrete.
However, actual trials shall be done at the site and temperatures be
measured. Necessary adjustments may be
done depending upon actual site conditions
CALCULATIONS FOR M30 GRADE OF CONCRETE (TYPICAL)
Material
|
Mass
(kglcu.m) |
Specific
heat (kJlkg.k) |
Joule of vary
temperature by 1° C |
Initial
temperature of material (°C) |
Total joule
in material |
1
|
2
|
3
|
2x3=4
|
5
|
4x5=6
|
360
|
0.92
|
331.2
|
40
|
13248
|
|
Water
|
122.8
|
4.184
|
513.8
|
30
|
15414
|
Aggregate
|
1828.2
|
0.92
|
1681.9
|
37
|
62230.3
|
Ice
|
50
|
4.184
|
209.2
|
0
|
0
|
Ice (Fusion)
|
(-)50x33.5
kj/kg) |
______________
|
-16750.0
|
||
Total
|
2736.1
|
74136.3
|
Concrete temperature
|
=
|
Column 6
Column 4
|
=
|
74136.3
2736.1
|
=
|
27° C
|
Percentage of water substituted by ice
flakes = 29% since{(50/172.8) = 0.2893}
CALCULATIONS FOR M35 GRADE OF CONCRETE (TYPICAL)
Material
|
Mass
(kg/cu.m) |
Specific
heat (kJ/kg.k) |
Joule of vary
temperature by 1° C |
Initial
temperature of material (° C) |
Total joule
in material |
1
|
2
|
3
|
2x3=4
|
5
|
4x5=6
|
Cement
|
410
|
0.92
|
377.2
|
40
|
15088
|
Water
|
168.1
|
4.184
|
703.3
|
30 I
|
21099
|
Aggregate
|
1799.9
|
0.92
|
1655.9
|
37
|
61268.3
|
Ice
|
50
|
4.184
|
209.2
|
0
|
0
|
Ice
(Fusion) |
(-)50x33.5
kj/kg) |
-16750.0
|
|||
Total
|
2945.6
|
80705.3
|
Concrete temperature
|
=
|
Column 6
Column 4
|
=
|
80705.3
2945.6
|
=
|
27° C
|
Percentage of water substituted
by ice flakes = 29%
construction companies in islamabad
ReplyDeleteconstruction companies in islamabad
construction companies in islamabad
construction companies in islamabad
construction companies in islamabad
construction companies in islamabad
construction companies in islamabad
construction companies in islamabad
Inspiring writings and we greatly admired what you have to say, hope you continue to provide new ideas for us all and greetings success always for you. You can also visit Events Cooling Solutions UAE utilizing our experience in temporary cooling/temperature. Event planning starts with choosing the right HVAC equipment.
ReplyDelete