STRUCTURAL MEMBERS REQUIRED FOR TOP-DOWN CONSTRUCTION (Top Down Construction- Part 2)




Top Down Construction -Part 1


STRUCTURAL MEMBERS REQUIRED FOR TOP-DOWN CONSTRUCTION
Design and construction principles for top-down method primarily call for two major structural elements.
·        Columns with sufficient capacity must be pre-founded in bored piles or barrettes to sustain the construction load and to utilize as part of bracing system.
·         Excavation for basement must be carried out with the support of permanent
           retaining wall so that basement floor slabs can be utilized as lateral bracing.
Diaphragm wall of 0.8m to 1.2m in thickness with sufficient embedment in firm soil layers is commonly used as a retaining wall whereas prefabricated steel columns known as Stanchions embedded in either large diameter deep-seated bored piles or barrettes are utilized as structural columns. Figure 1 illustrates the top-down construction method with utilization of stanchions and diaphragm wall.


Installation of Diaphragm wall
Construction of guide wall
A guide wall is constructed to set out the position of the diaphragm wall.
Excavation of panel
The grab/trench cutter cuts and removes the soil to form the panel. The excavation is stabilised by filling it with bentonite slurry to support the wall of the excavation.

Installation of Rebar cage and concreting

The crane lifts up the reinforcement-bar cage and places it within the panel. Concrete is poured into the panel to form the panel wall.
Repetition of process
Process 2 - 4 repeats for the remaining soil in between the panels till the entire length of the diaphragm wall construction is completed.



TYPES OF STANCHION AND THEIR APPLICATION



TYPES OF STANCHION
General information

Material & Example Size


Application

limitation




Light stanchion




Steel H-beams
350x350x137kg/m



For semi top-down
construction
• For temporary decking



Limited capacity of light stanchion does not allow for construction of super
structure until completion of
basement construction



Medium sized stanchion


Steel H-beams
350x350x390 kg/m

For semi and full top-down
construction of shallow to
medium deep excavation



Limited number of super
structure floors construction





Heavy stanchion

Steel H-beams
508x457x738kg/m
• Composite steel columns
built up by 2 or more small
to medium size H-beams
• Large section pre-cast RC
column (seldom use)



Full top-down construction in
deep excavation

   

       Depending on the loading
condition, numbers of
superstructure floors can be
constructed before
completing basement
excavation



STANCHION INSTALLATION METHODS
Stanchion installation method is usually selected by the piling contractor who takes into consideration three main factors such as installation depth, size of stanchion and size of bored or barrette piles. Though installation details may be different from one contractor to another, stanchion installation can be categorized under two main methods, post-concreting or plunging installation and pre-concreting installation or placing stanchion prior to concreting.
Post-concreting installation or plunging method
In this method, stanchion is installed immediately after completion of bored pile concreting process. General construction sequence involved in this method is demonstrated in Figure 2.
Guide frame is used to install thestanchion at the correct position. 

Pre concreting method
In this method, stanchion is installed immediately after completion of drilling and reinforcement lowering prior to concreting process. In some projects stanchion is attached to the last section of reinforcement and installed together with the reinforcement. General construction steps involved in this method are demonstrated in Figure 3.

Advantages and disadvantages
Advantages:
1. The shortened construction period due to simultaneous construction of the basement and the superstructure.
2. More operational space gained from the advanced construction of floor slabs.
3. The higher stiffness of floor slab compare to steel struts improves the safety of excavation.
4. It is highly suitable for construction for tall buildings with deep basements to be constructed in urban areas.
Disadvantages:
1. Higher cost (due to the construction of pile foundation)
2. Since the construction period of the basement is lengthened, the lateral displacement of retaining wall or ground settlement may possible increase due to the influence of creep if the soil layers are encountered.
3. The construction quality may influence because of worsened ventilation and illumination under floor slab.
4. It requires highly skilled supervision and labour force.

Case Study
a)  The Top-Down Construction in Indonesia:
The top down construction in Indonesia was introduced for the first time in 1994. The project was the Bank Indonesia C-Building Projects (12 stories, and 3 basement), and PT. (Persero) Wijaya Karya was the main contractor.
In, 1995 another project was Menara Merdeka Building (30 stories, 3 basement) also built by top-down construction. The main contractor was joint operation of PT. (Persero) Pembangunan Perumahan and PT. (Persero) Wijaya Karya.
The largest project in Indonesia that use the top-down construction was Pasar Baru Bandung Project , 2003. The huge building was consisted 120,000 sq.m, 10 stories plus 3 basements, and the time line for accomplishing the project was only 8 months. The main contractor was PT. (Persero) Pembangunan Perumahan.
b)    The one seen here depicts the basement entrance for the Cheung Kong Center projectin hong kong, which best illustrates the method. The top-down construction method is virtually the only method suitable for the construction of deep basements on a large scale. One irresistible advantage of this method is that substructure and superstructure work can be carried out at the same time.
C)   Top-down basement construction: the permanent RC structure at the top has been completed but remains supported on temporary steel stanchions, while the excavation and construction work to the lower basement is yet to be continued. (Lee Gardens)
d)    Another feature of top-down construction is that the ground floor slab (indeed, any slab close to ground level) is cast first as a starting level to provide the necessary rigidity to the side supports. This example, from the Festival Walk project, best illustrates the arrangement



Conclusion
From the above report we can conclude that top down constuction has its suitability for certain kind of mega structures. It is suitable for structures with deep basements like undergrond rails, car parks etc. It is also very efficient way of doing two way construction to save time. Skyscrapers with deep basements in urban areas should be constucted using top down construction. But top down construction needs very efficient planning and designing and skilled supervision and labour force. Top down construction is the need of the hour as it is highly time efficient and is becoming popular and is coming more and more in practice with every passing day.




21 comments:

  1. In the building construction work technique is very important which decide the actual strength of the building. It is important to use right techniques. You have mention very good information related with construction techniques

    ReplyDelete
  2. Doesn'tworry you're not only during this aspect and is rightfully get the immune organisation and too help oneself in yearner and stronger
    orgasms. Are you abashed by solution but this is the safely and lifelike way.
    During sexual foreplay, rip current reaches
    the than 2. 75 inches farseeing when rear - it is estimated
    that just about 45% of men are interested close to their penis sizing. Do they comprise job, debt you owe, mortgage payments or your car that but stony-broke mastered.
    My web page :: site

    ReplyDelete
  3. In that respect, this іtem ԁoeѕ work or at the really least does not make untrue claіms.


    Feel free to vіsit my blog post: http://www.Yepcheck.Com

    ReplyDelete
  4. Ѕo what сan this all mean?

    Look into mу wеb page: flex Belt Reviews

    ReplyDelete
  5. Τhe belt could bе worn whereѵer so you
    can get a gгeat work out tаkіng
    a cat nap or wаshing hοme.

    Alsο visit my homeрage ... Ppfog.Com

    ReplyDelete
  6. Thіrԁ, ԁistrіbutorѕ аre so confident in its skills thаt thеy оffer сash bаck guaгanteeѕ fοг pеoρle todaу whο trу it οut.



    Hеre іs mу web page; Please click for source

    ReplyDelete
  7. Not just that, you can іnԁulgе in furtheг ρеrforms еven thοugh weаring thіs.


    Also viѕіt my website Www.Squidoo.Com

    ReplyDelete
  8. Essentially the flex belt is a belt you strap on around your
    waist and three particularly placed pads are what aid contract your abs.


    my website :: social.uppermovement.stuffsupresale.com

    ReplyDelete
  9. There are many causes why people prefer this belt.

    Feel free to surf to my web-site: com.br

    ReplyDelete
  10. It serves far more purposes and it can't be destroyed or consumed physically.

    My weblog flex belt review

    ReplyDelete
  11. This is such an informative blog, your opinion, observations and ideas are amazing and to the point. I would love to read more content like this, and I want to give one advice to you are looking for a best builders in bhopal then Sagar Green Hills is the ideal township for you.

    ReplyDelete
  12. Excellent blog! I am amazed with suggestions of author. Home Improvement Contractors

    ReplyDelete
  13. Good articles, Have you heard of LFDS (Le_Meridian Funding Service, Email: lfdsloans@outlook.com --WhatsApp Contact:+1-9893943740--lfdsloans@lemeridianfds.com) is as USA/UK funding service they grant me loan of $95,000.00 to launch my business and I have been paying them annually for two years now and I still have 2 years left although I enjoy working with them because they are genuine Loan lender who can give you any kind of loan.

    ReplyDelete
  14. I read your Article and Thank you so much,this is very useful post and i realy like it.keep sharing like this.
    Outsource CAD project

    ReplyDelete
  15. Thank you for your post. This is excellent information. It is amazing and wonderful to visit your site.
    https://indusdesignworks.com/online-drafting-services.php
    Online detailing services

    ReplyDelete
  16. So, if you don’t have a lot of time to detox and pass a drug test for cannabis, we hope you now know the basic immediate steps to be taken To avoid generating a bald area, they can collect hairs from several locations on your crown This vinegar made of fermented apples does not only help you pass a urine test but can also come in handy before a hair drug test Light users can remove traces of marijuana from their bodies faster than heavy users Next, you are required to take the detox liquid on the final day of the plan If you’re still eager to find out those techniques that could save you the embarrassment of failing a hair drug test, read on Visit: https://www.urineworld.com/

    ReplyDelete
  17. Allsite Developments Pty Ltd has Bulk excavation contractors near me for your help. Get information about our services and products. Pick the phone and call us at 0414 273 557
    bulk excavation contractors

    ReplyDelete