MIVAN (Aluminium Formwork)

 

 

 

FORMWORK

 

When concrete is placed, it is in plastic state. It requires to be supported by temporary supports and castings of desired shape till it becomes sufficiently strong to support its own weight. This temporary casing is known as the formwork or forms or shuttering. The term moulds is sometimes used to indicate formwork of relatively small units such as lintels, cornices etc.

 

Definition of formwork:-

"Forms or moulds or shutters are the receptacles in which concrete is placed, so that it will have desired shape or outline when hardened. Once concrete develops the adequate strength to support its own weight they can be taken out". .. (ACC).

"Formwork is the term given to either temporary or permanent moulds into which concrete or similar materials are poured". … (Wikipedia Encyclopedia).

 

Requirements of a good formwork

The essential requirements of formwork or shuttering are: -

a)      It should be strong enough to take the dead and live loads during construction.

b)      The joints in the formwork should be rigid so that the bulging, twisting, or sagging due to dead and live load is as small as possible. Excessive deformation may disfigure the surface of concrete.

c)      The construction lines in the formwork should be true and the surface plane so that the cost finishing the surface of concrete on removing the shuttering is the least.

d)     The formwork should be easily removable without damage to itself so that it could be used repeatedly.

Classification of Formwork

Formwork can be classified according to a variety of categories, relating to the differences in sizes, the location of use, construction materials, nature of operation, or simply by the brand name of the products. However, the huge amount of tropical wood being consumed each year for formwork has resulted in criticism from environmentalists, as well as the continual escalation of timber prices. As a result, there has been a strong tendency to use other formwork materials or systems to replace timber. The different categories in which formwork can be classified are:

a)      According to size.

b)      According to location of use.

c)      According to materials of construction.

d)     According to nature of operation.

e)      According to brand name of the product.

Classification according to size

Classification according to the size of formwork can be very straightforward. In practice, there are only two sizes for formwork; small-sized and large-sized. Any size which is designed for operation by workers manually is small-sized. Very often, the erection process is preferably handled by a single worker, with site work best done independently to avoid possible waiting times. Due to reasons of size and weight, the materials and construction of small-sized formwork are thus limited. At present, the most common systems are made of timber and aluminium, and are usually in the form of small panels. There is seldom medium-sized formwork. In cases in which large-sized formwork is used, the size of the form can be designed as large as practicable to reduce the amount of jointing and to minimize the amount of lift. The stiffness required by large-sized formwork can be dealt with by the introduction of more stiffening components such as studs and soldiers. The increase in the weight of the formwork panels is insignificant as a crane will be used in most cases.

 

 

Classification according to the location of use: -

There are not many effective formwork systems for stairs and staircases. The complicated three-dimensional nature of an element involving suspended panels and riser boards, as well as the need to cope with very different spatial and dimensional variances as required by individual design situations, cannot be achieved by a universally adaptable formwork system

Classification according to materials of construction

Materials used for formwork are traditionally quite limited due to finding the difficult balance between cost and performance. Timber in general is still the most popular formwork material for its relative low initial cost and adaptability Steel, in the form of either hot-rolled or cold-formed sections and in combination with other sheeting materials, is another popular choice for formwork materials. In the past two to three years, full aluminium formwork systems have been used in some cases but the performance is still being questioned by many users, especially in concern to cost and labor control.


 

Classification according to nature of operation

Formwork can be operated manually or by other power-lifted methods. Some systems are equipped with a certain degree of mobility to ease the erection and striking processes, or to allow horizontal moment using rollers, rails or tracks.

Timber and aluminium forms are the only manually-operable types of formwork. They are designed and constructed in ways that they can be completely handled independently without the aid of any lifting appliances. On the other end of the scale, such systems are used in very large-sized and horizontally-spread buildings with complicated layout designs which require the systems' flexibility. Fig 2.4 & 2.5 shows the formwork system allowing the incorporation of pre-cast elements and self climbing form with hydraulic jack devices respectively.

 

formwork system allowing the         example of a self-climbing form with

Incorporation of pre-cast elements (govt. quarters)    detail of the hydraulic jack devices (source Raymond, 2001)

Classification according to brand name of the product

Several patented or branded formwork systems have successfully entered the local construction market in the past decade. These include products from brands SGB, RMD, VSL, MIVAN, Thyssen and Cantilever. Each of these firms offers its own specialized products, while some can even provide a very wide range of services including design support or tender estimating advice. As the use of innovative building methods is gaining more attention from various sectors in the community, advanced formwork systems are obviously a promising solution. The input through research and development by the well-established formwork manufacturers is of no doubt contributing to efforts in these areas. (Fig 2.6)

 

 

VSL FORMWORK (Source Raymond, 2001)

 

 

Loads acting on Formwork

In Construction, the formwork has to bear, besides its own weight, the weight of wet concrete, the live load due to labor, and the impact due to pouring concrete and workmen on it. The vibration caused due to vibrators used to compact the concrete should also be taken care off. Thus, the design of the formwork is an essential part during the construction of the building.

For the design of planks and joists in bending & shear, a live load including the impact may be taken as 370kg/m². It is however, usual to work with a small factor of safety in the design of formwork. The surfaces of formwork should be dressed in such a manner that after deflection due to weight of concrete and reinforcement, the surface remains horizontal, or as desired by the designer. The sheathing with full live load of 370 kg/m² should not deflect more than 0.25 cm and the joists with 200kg/m² of live load should not deflect more than 0.25cm.

In the design of formwork for columns or walls, the hydrostatic pressure of the concrete should be taken into account. This pressure depends upon the quantity of water in the concrete, rate of pouring and the temperature.

The hydrostatic pressure of the concrete increases with the following cases:-

·    Increase in quantity of water in the mix.

·    The smaller size of the aggregate.

·    The lower temperature.

·    The higher rate of pouring concrete.

If the concrete is poured in layers at an interval such that concrete has time to set, there will be very little chance of bulging.

Aluminium as usual is not a very strong material. So the basic elements of the formwork system are the panel which is a framework of extruded aluminium sections welded to an aluminium sheet. It consists of high strength special aluminium components. This produces a light weight panel with an excellent stiffness-to-weight ratio, yielding minimal deflections when subjected to the load of weight concrete. The panels are manufactured in standard sizes with non-standard elements produced to the required size and size to suit the project requirements.

 

Design Aspects

 

In MIVAN formwork we give stress on shear wall rather than conventional framed structure of columns and beams. In general the design of a wall formwork is described as under.

Consider designing a wall for 30 cm thick and 5 m high. The concrete is poured at shifts of 1.5 m each. The sheathing is placed horizontally and spans between vertical studs are under horizontal pressure due to wet concrete. These Studs are backed by the horizontal pieces called Wales which are tied by bolts, passing through the wall. Thus pressure on either side of the wall is self balanced as shown fig 2.4.1.

The pressure exerted by concrete will be 2300 equivalent weight of fluid at a depth of h meters. Taking lowest portion of the sheathing, the pressure is equal to 2300 x 1.5 =3450 kg/ sq.m. If the sheathing is 25 cm thick, the spacing x of the studs is given by M=bd²/6 x σ;

σ = 102 kg/ sq cm where σ is safe fiber-stress.

Or,       3450 x = 1 x 2.5²/6 x 102

100² x 10

 

Or,     x = 55.5 cm.

Adopt the spacing of 55 cm apart.

If the spacing of wales is 68cm, the average pressure on the studs between two bolts will be 2300(1.5-68/2) x .55 =1468 kg per meter run, assuming concrete pouring is started at level of a low bolts.

Max S.F. at edges of clear span = 1468 x 0.6/2 = 440 kg.

Assume studs to be 7.5 cm x 10 cm,

Shear stress = 3/2 x 440/ (7.5 x 10) = 8.8 kg/ sq cm.

Maximum fiber stress = 6785 x 10/2 = 54.3 kg/ sq cm.

7.5 x 10³/12

 

So the section adopted is satisfactory.

 

Aluminium Formwork

The panels of aluminium formwork are made from high strength aluminium alloy, with the face or contact surface of the panel, made up of 4mm thick plate, which is welded to a formwork of specially designed extruded sections, to form a robust component. The panels are held in position by a simple pin and wedge arrangement system that passes through holes in the outside rib of each panel. The panel fits precisely, securely and requires no bracing. The walls are held together with high strength wall ties, while the decks are supported by beams and props.

Since the equipment is made of aluminium, it has sections that are large enough to be effective, yet light enough in the weight to be handled by a single worker. Individual workers can handle all the elements necessary for forming the system with no requirement for heavy lifting equipment or skilled labor. By ensuring repetition of work tasks on daily basis it is possible for the system to bring assembly line techniques to construction site and to ensure quality work, by unskilled or semi-skilled workers.

Trial erection of the formwork is carried out in factory conditions which ensure that all components are correctly manufactured and no components are missed out. Also, they are numbered and packed in such a manner so as to enable easy site erection and dismantling.

 

MERITS OF ALUMINIUM FORMWORK:-

                                            i.In contrast to most of the modern construction systems, which are machine and equipment oriented, the formwork does not depend upon heavy lifting equipment and can be handled by unskilled labors.

                                          ii.Fast construction is assured and is particularly suitable for large magnitude construction of respective nature at one project site.

                                        iii.Construction carried out by this system has exceptionally good quality with accurate dimensions for all openings to receive windows and doors, right angles at meeting points of wall to wall, wall to floor, wall to ceiling, etc, concrete surface finishes are good to receive painting directly without plaster.

                                         iv.System components are durable and can be used several times without sacrificing the quality or correctness of dimensions and surface.

                                           v.Monolithic construction of load bearing walls and slabs in concrete produces structurally superior quality with very few constructions joined compared to the conventional column and beam slabs construction combined with filter brick work or block work subsequently covered by plaster.

                                         vi.In view of the four – day cycle of casting the floor together with all slabs as against 14 to 20 – day cycle in the conventional method, completed RCC structure is available for subsequent finish trades much faster, resulting in a saving of 10 to 15 days per floor in the overall completion period.

                                       vii.As all the walls are cast monolithic and simultaneously with floor slabs requiring no further plasters finish. Therefore the time required in the conventional method for construction of walls and plastering is saved.

                                     viii.As fully completed structural frame is made available in one stretch for subsequent – finishing items, uninterrupted progress can be planned ensuring, continuity in each trade, thereby providing as cope for employing increased labor force on finishing item.

                                        ix.As the system establishes a kind of "Assembly line production" phase – wise completion in desired groups of buildings can be planned to achieve early utilization of the buildings.

2.5.2: -Comparison of Aluminum Form Construction Technique Over                         Conventional Forms:

Advantages of aluminium formwork over conventional construction

                                            i.More seismic resistance: - The box type construction provides more seismic                                                         resistance to the structure.

                                          ii.Increased durability: - The durability of a complete concrete structure is more                                               than conventional brick bat masonry.

                                        iii.Lesser number of joints thereby reducing the leakages and enhancing the durability.

                                         iv.Higher carpet area- Due to shear walls the walls are thin thus increasing area.

                                           v.Integral and smooth finishing of wall and slab- Smooth finish of aluminium can be seen vividly on walls.

                                         vi.Uniform quality of construction – Uniform grade of concrete is used.

                                       vii.Negligible maintenance – Strong built up of concrete needs no maintenance.

                                     viii.Faster completion – Unsurpassed construction speed can be achieved due to light    weight of forms

                                        ix.Lesser manual labor- Less labor is required for carrying formworks.

                                          x.Simplified foundation design due to consistent load distribution.

                                        xi.The natural density of concrete wall result in better sound transmission coefficient.

 

 

 

RELATIVE COMPARISON OF IN – SITU "ALUMINIUM FORM" SYSTEM WITH CONVENTIONAL CONSTRUCTION.

 

SL.No

FACTOR

CONVENTIONAL

IN – SITU ALUMINIUM FORM SYSTEM

REMARKS

 

1

Quality

Normal

Superior.                                     In – Situ casting of whole structure and transverse walls done in a continuous operation, using controlled concrete mixers obtained from central batching, mixing plants and mechanically placed through concrete buckets using crane and compacted in leak proof moulds using high frequency vibrators

Superior quality in "System housing"

2

Speed of construction.

The pace of construction is slow due to step – by – step completion of different stages of activity the masonry is required to be laid brick by brick. Erection of formwork, concreting and deshuttering forms is a two – week cycle. The plastering and other finishing activities can commence only thereafter.

In this system, the walls and floors are cast together in one continuous operation in matter of few hours and in built accelerated curing overnight enable removal and re-use of forms on daily cycle basis.

System construction is much faster.

 

 

 

 

3

Aesthetics.

In the case of RCC structural framework of column and beams with partition brick walls is used for construction, the columns and beams show unsightly projections in room interiors.

The Room – Sized wall panels and the ceiling elements cast against steel plates have smooth finishing and the interiors have neat and clean lines without unsightly projections in various corners. The walls and ceilings also have smooth even surfaces, which only need colour/white wash

 

4

External finishes.

Cement plastered brickwork, painted with cement – based paint. Finishing needs painting every in three years.

Textured / pattern coloured concrete facia can be provided. This will need no frequent repainting.

Permanent facia finishes feasible with minor extra initial cost

 

5

Useful carpet area as % of plinth area.

Efficiency around 83.5%

Efficiency around 87.5%

More efficient utilization of land for useful living space.

6

Consumption of basic raw materials

 

Cement.

 

 

 

 

 

 

 

 

Reinforcing Steel

 

 

 

Normal

 

 

 

 

 

 

 

 

Reinforcing steel required is less as compared to the in situ construction as RCC framework uses brick wall as alternative

 

 

 

 

 

Consumption somewhat more than that used in conventional structures.

 

 

 

 

 

 

It may, however will be slightly more than corresponding load – bearing brick wall construction for which, requirements of IS 456 have to be followed for system housing.

 

 

 

 

Although greater consumption strength and durability is also more

 

 

 

Steel requirement is more, as it is required for the shear wall construction. But shear wall construction increases safety against earthquake.

7

Maintenance

In maintenance cost, the major expenditure is involved due to :

·    Repairs and maintenance of plaster of walls / ceiling etc.

·    Painting of outer and inner walls.

Leakages due to plumbing and sanitation installation.

The walls and ceiling being smooth and high quality concrete repairs for plastering and leakage's are not at all required frequently.

It can be concluded that maintenance cost is negligible.

 

 

 

 

MIVAN: - A Versatile Formwork

The system of aluminum forms (MIVAN) has been used widely in the construction of residential units and mass housing projects. It is fast, simple, adaptable and cost – effective. It produces total quality work which requires minimum maintenance and when durability is the prime consideration. This system is most suitable for Indian condition as a tailor–made aluminum formwork for cast–in–situ fully concrete structure.

Background

Mivan is basically an aluminium formwork system developed by one of the construction company from Europe. In 1990, the Mivan Company Ltd from Malaysia started the manufacturing of such formwork systems. Now a day more than 30,000 sq m of formwork used in the world are under their operation. In Mumbai, India there are number of buildings constructed with the help of the above system which has been proved to be very economical and satisfactory for Indian Construction Environment.

The technology has been used extensively in other countries such as Europe, Gulf Countries, Asia and all other parts of the world. MIVAN technology is suitable for constructing large number of houses within short time using room size forms to construct walls and slabs in one continuous pour on concrete. Early removal of forms can be achieved by hot air curing / curing compounds. This facilitates fast construction, say two flats per day. All the activities are planned in assembly line manner and hence result into more accurate, well – controlled and high quality production at optimum cost and in shortest possible time.

In this system of formwork construction, cast – in – situ concrete wall and floor slabs cast monolithic provides the structural system in one continuous pour. Large room sized forms for walls and floors slabs are erected at site. These forms are made strong and sturdy, fabricated with accuracy and easy to handle. They afford large number of repetitions (around 250). The concrete is produced in RMC batching plants under strict quality control and convey it to site with transit mixers.

The frames for windows and door as well as ducts for services are placed in the form before concreting. Staircase flights, façade panels, chejjas and jails etc. and other pre-fabricated items are also integrated into the structure. This proves to be a major advantage as compared to other modern construction techniques.

The method of construction adopted is no difference except for that the sub – structure is constructed using conventional techniques. The super–structure is constructed using MIVAN techniques. The integrated use the technology results in a durable structure.

 

Modular Formwork

 

The formwork system is precisely-engineered system fabricated in aluminium. Using this system, all the elements of a building namely, load bearing walls, columns, beams, floor slabs, stairs, balconies etc can be constructed with cast in place concrete. The resulting structure has a good quality surface finish and accurate dimensional tolerances. Further, the construction speed is high and the work can be done in a cost effective manner.

The modular nature of the formwork system allows easy fixing and removal of formwork and the construction can proceed speedily with very little deviation in dimensional tolerances. Further, the system is quite flexible and can be easily adapted for any variations in the layout.

The availability of concrete from ready mix concrete facility has augured well for the use of this work system. However, the proliferation of RMC facilities in the cities in India and the willingness to use mechanized means of transport and placing of concrete, the use of aluminium formwork system has received a boost. The quality of the resulting concrete is found to be superior.

Structurally speaking, the adoption of the closed box system using monolithic concrete construction has been found to be the most efficient alternatives. The stresses in both the concrete and steel are observed to be much lower even when horizontal forces due to wind or earthquake are taken into consideration.

The formwork system can be used for construction for all types of concrete systems, that is, for a framed structure involving column beam –slab elements or for box-type structure involving slab-walls combination.

 

FORMWORK – COMPONENTS:

The basic element of the formwork is the panel, which is an extruded aluminium rail section, welded to an aluminium sheet. This produces a lightweight panel with an excellent stiffness to weight ratio, yielding minimal deflection under concrete loading. Panels are manufactured in the size and shape to suit the requirements of specific projects.

The panels are made from high strength aluminium alloy with a 4 mm thick skin plate and 6mm thick ribbing behind to stiffen the panels. The panels are manufactured in MIVAN'S dedicated factories in Europe and South East Asia. Once they are assembled they are subjected to a trial erection in order to eliminate any dimensional or on site problems.

All the formwork components are received at the site whining three months after they are ordered. Following are the components that are regularly used in the construction.

 

-WALL COMPONENTS:

1) Wall Panel: - It forms the face of the wall. It is an Aluminium sheet properly cut to fit the exact size of the wall.

                                 

                                                  FIG 3.1: WALL PANEL

 

 

 

 

2) Rocker: - It is a supporting component of wall. It is L-shaped panel having                                         allotment holes for stub pin.

 

                                     

                                                             FIG 3.2: ROCKER

3) Kicker: - It forms the wall face at the top of the panels and acts as a ledge to                         support.

 

                            

                                                          FIG 3.3: KICKER

 

 

 

4) Stub Pin: - It helps in joining two wall panels. It helps in joining two joints.

 

                                    

                                                    FIG 3.4: STUB PIN

 

 

3.2.2: - BEAM COMPONENTS:

1) Beam Side Panel: - It forms the side of the beams. It is a rectangular structure and                             is cut according to the size of the beam.

 

                        

                                               FIG 3.5: BEAM SIDE PANEL

 

 

 

 

2) Prop Head for Soffit Beam: - It forms the soffit beam. It is a V-shaped head          for easy dislodging of the formwork.

                           

                                FIG 3.6: PROP HEAD FOR SOFFIT BEAM.

 

 

 

 

3) Beam Soffit Panel: - It supports the soffit beam. It is a plain rectangular                                                        structure of aluminium.

 

                        

                                             FIG 3.7: BEAM SOFFIT-PANEL

 

 

 

 

4) Beam Soffit Bulkhead: - It is the bulkhead for beam. It carries most of the bulk     load.

                         

                                    FIG 3.8: - BEAM SOFFIT BULKHEAD

3.2.3: DECK COMPONENT:

1) Deck Panel: - It forms the horizontal surface for casting of slabs. It is built   for proper safety of workers.

 

                      

                                                FIG 3.9: - DECK PANEL

2) Deck Prop: - It forms a V-shaped prop head. It supports the deck and bears the load coming on the deck panel.

                                   

                                                 FIG 3.10: -DECK PROP

 

 

3) Prop Length: - It is the length of the prop. It depends upon the length of the slab.

                                     

                                             FIG 3.11: - DECK PROP LENGTH

 

 

 

 

 

4)  Deck mid – Beam: - It supports the middle portion of the beam. It holds the concrete.

 

                      

                                            FIG 3.12: - DECK MID-BEAM

 

 

 

5) Soffit Length: - It provides support to the edge of the deck panels at their perimeter of the room.

 

                      

                                                  FIG 3.13: - SOFFIT LENGTH

 

6)  Deck Beam Bar: - It is the deck for the beam. This component supports the deck and beam.

                            

                                                        FIG 3.14: -DECK BEAM BAR

 

3.2.4: OTHER COMPONENTS:

1) Internal Soffit Corner: - It forms the vertical internal corner between the  walls and the beams, slabs, and the horizontal internal cornice between the walls and the beam slabs and the beam soffit.

          

                                FIG 3.15: -INTERNAL SOFFIT CORNER

 

2) External Soffit Corner: - The external soffit corners forms the vertical external corner between walls and / or beam faces and horizontal external corners between wall / beam face and soffit of slabs.

                 

                                    FIG 3.16: -EXTERNAL SOFFIT CORNER

 

3) External Corner: - The external corner connects vertical or horizontal form work together at right angles.

 

                                    

 

                                  FIG 3.17: - EXTENAL CORNER

 

 

 

 

 

4) Internal Corner: - It connects two pieces of vertical formwork pieces at their internal intersections.

                                               

                                             FIG 3.18: - INTERNAL CORNERS

 

 

 

 

FORMWORKS ASSEMBLE:

MIVAN aims in using modern construction techniques and equipment in all its projects. On leaving the MIVAN factory all panels are clearly labeled to ensure that they are easily identifiable on site and can be smoothly fitted together using the formwork modulation drawings. All formwork begins at a corner and proceeds from there.

 

                                         FIG 3.19: - WALL ASSEMBLY DETAILS

 

 

                                    FIG 3.20: - BEAM ASSEMBLY DETAILS

 

 

 

 

SIMPLICITY – PIN AND WEDGE SYSTEM:

 

The panels are held in position by a simple pin and wedge system that passes through holes in the outside rib of each panel. (Fig.No.3.21)
The panels fit precisely, simply and securely and require no bracing. Buildings can be constructed quickly and easily by unskilled labor with hammer being the only tool required. Once the panels have been numbered, measuring is not necessary. As the erection process is manually, tower cranes are not required. The result is a typical 4 to 5 day cycle for floor – to – floor construction.

 

EFFICIENT – QUICK STRIP PROP HEAD:

One of the principal technical features which enables this aped to be attained using a single set of formwork panel is the unique V shaped a prop head which allows the 'quick strip' to take place whilst leaving the propping undisturbed. The deck panels can therefore be resumed immediately. (Fig.No.3.22).

CONSTRUCTION ACTIVITIES WITH MIVAN AS FORMWORK

The construction activities are divided as pre – concrete activities, during concreting and post – concrete activities. They are as follows:

 

 

PRE – CONCRETE ACTIVITIES:

i) RECEIPT OF EQUIPMENT ON SITE:

a) Unload components from transport and where possible, stack by code and size panels can normally be stacked safely up to 25 panels high on skids or pallets.

b) When stacked, holing in the formwork should be aligned allowing easy   identification by code.

c) Ensure the first panel at the bottom of the stack has the contact face                                                       upwards.

d) All pins, wedges, wall ties, P.E sleeves, L.D.P.E sheet and special tools to be put into proper storage and only distributed as required.

e) A check requires to be carried out against the packing list ensuring all items stated are received.

 

 

ii) LEVEL SURVEYS:

a) A concrete level survey should be taken on all sites and remedial work carried out prior to the erecting of formwork.

b) All level surveys should be taken from T.B.M (Temporary Bench Mark).

c) In certain cases it is good practice to mark the slabs with paint indicating a plus (+) or minus (-) as the survey is being conducted. The eliminates unnecessary circulation of paper copies to site personnel, and supervisor can identify at a glance any remedial work required.

d) High spots along the wall line to be chipped off to the proper level.

Low spots along the wall line should be packed to the required level, using                 plywood or timber.

Packing the corner and the centre of the wall length to the required level will be normally be adequate, as the formwork when pinned together will bridge across low spots.

e) Concrete (+8mm) and above must be chipped to the correct level.

    After concreting, level surveys should also be carried out on the top of the kickers. One reason for structural deviation from the centre line can be on a – level kicker. This in turn means the formwork is not in plumb.

f) Kickers are manufactured with a 26mm slotted hole on the face to allow for adjustment after concreting.

g) As with the concrete level survey, proper records of the kicker survey should be kept on file by the allocated supervisor.

h) Also a deviation survey requires to be carrying out and keeping on fire.

iii) SETTING OUT:

a) Only approved shell drawings supplied by Mivan Formwork Design should be used for setting out.

b) Setting out lines should continue through openings, external corners etc, by a minimum of 150mm. This makes it easier to fix formwork in position prior to concreting.

c) It is very important that the reference points and the setting out points are protected against accidental movement or damage.

d) Transferring of reference points from the level below requires to be done quite accurately. Incorrect reference points give incorrect deviations therefore creating unnecessary work for the formwork erection. It is suggested a theodolite be used for transferring the points through openings provided in the slab.

iv) CONTROL/CORRECTING OF DEVIATIONS:

a) A study of the deviation and kicker level survey should confirm what, if any, corrective action is required.

b) If the kicker requires adjustment for level, loosen the holding- in bolt by turning anti-clockwise, adjust kicker to the required position and retighten the bolt.

c) Once the vertical formwork is fixed in position, the external corners should be checked for plumbness. This will determine if further action is required to control the deviation.

d) In addition to the kicker levels, the formwork can be pulled by using bottle screws and chain blocks; if the formwork requires to be pushed adjustable props can be used.

v) ERECT FORM WORK:

For the initial set up only 50mm*25mm timber stays can be nailed to the concrete slab, close to the internal and external corners, to ensure the formwork is erected to the setting out lines.

All formwork begins at a corner and proceeds from there. This is to provide temporary lateral stability.  A single panel at a corner will give sufficient lateral support to a very long section of wall.

Ensure all edges of the formwork and contact face are properly cleaned ad oiled prior to fixing in place.

 

      When satisfied the corner is stable and the internal corner is positioned to the setting out lines continue erecting the formwork to one wall. Use only 2 no of pins and wedges to connect the formwork at this stage a the pins and wedges will have to be removed later to insert the wall ties. Alternatively the wall ties can be positioned as the formwork is erected. For ease of striping, pin the wall panels to the internal corners with the head of pin to the inside of the internal corner if possible.

 

   Wall ties should be coated with the releasing agent provided before being fixed to the formwork. Fit the wall ties through slots in the wall formwork and secure in position with pins and wedges.

   Prior to closing the formwork, pre-wrapped corrugated PVC sleeves are placed over the wall ties. Please ensure, since preparation of the sleeves they have not been abused in any way before installing, as this can have an adverse effect in the removal of the wall tie after concreting. Also, ensure they are located properly to the contact face of the formwork on each side of the wall. Sleeves installed with one end fixed between the side rails of two adjoining panels, exposes the wall tie at the opposite end, therefore impossible to retrieve the wall tie after concreting.

 

   When deviation of external walls occurs, they must be brought back to the correct plan location as quickly as possible. This is done by slightly tilting the external wall forms in one plane. If a deviation from plumb has occurred in two directions, then this should be improved over two floors, one for each direction. Realignment in two directions should not attempted on a single lift.

 

   A maximum of 8mm in vertically improvement in one lift is sufficient.

 

vi) METHOD OF ERECTING FORMWORK:

 

   It is important maximum efficiency to define a sequence of erection to be followed by each team. One side is erected using only on upper and lower pin and wedge connection. Later, ties are inserted at the the connection and fixing 

  With pin and wedge. Then previously installed pins are removed and those ties inserted and pinned. Subsequently, panels for the other side are inserted between the existing ties and fixed with pins and wedges.

 

   The advantages of this Erection Method are as Follows:-

1)      Rooms can be closed and squared by assembling only one side of wall panels. If misaligned, it is easier to shift rows of single panels.

2)      If steel reinforcement is likely to interfere with the placement of the ties, it can be seen and corrected without delaying the pane erection.

3)      Enables fast start up of deck teams as the first rooms can be closed quickly.

4)      Continuous steel reinforcement for the walls, creates a barrier between the two sides of the formwork, so the work proceeds at the pace of single erector.

Special care must be taken at the lift shafts. The interior panels will align properly on their own because they are set of the kicker from the formwork below. Ensure the kickers are level and will not effect the vertically of the lift shaft. However, the matching panels are set on the concrete that may not be level. If the concrete is too high in place, it can distort the alignment of the four sides of the lift shaft and must be broken out to allow a level base.

 

   Care must be taken so that the concrete and in particular the reinforcement does not become contaminated due to excessive or negligent application of the releasing agent.

 

   The ends of walls and door openings should be secured in position by nailing timber stays to the concrete slab. Walls require to be straightened by using a string line and securing in place by nailing timber stays to concrete slab. During this p\operation vertically of door openings also require to be checked for plumb. Where possible, door spacers should be lifted.

vii) ERECT DECK FORMWORK:

 

Normally deck panels can be struck after 36 hours. Striking times should be confirmed on a project to project basis.

The striking begins with the removal of deck beam. Remove the 132mm pin and the beam bars from the beam which has been identified for removal.

This is followed by removing the pins and wedges from the deck panels adjacent to the deck beam to be removed.

The deck beam can now be taken out.

 

   As the first panel in are rests on the support lip of the soffit length, the adjacent panel should be removed first. After removing the pins and wedges from the panel to be removed, a panel puller can be used to beak the bond from the adjacent formwork.

 

   Where there is no deck beam support and the panels span from wall to wall, one wall will have the supporting lip of the soffit length removed.

   Pins and wedges only to be removed on the identified component that is to be struck.

   Deck panel's remains in place longer than wall panels and will not come away easily unless proper cleaning and oiling is done during the erection process. Panels should confirm to the sequence of erection.

PROP LENGTHS :

Whenever the PL's is to be removed, use a wooden mallet to strike the bottom of the PL in the same direction as the beam and holding the PL with your other hand.

 

POST CONCRETE ACTIVITIES: 

1) CLEANING:

All components should be cleaned with scrapers and wire brushes as soon as they are struck. Wire brush is to be used on side rails only.

The longer cleaning is delayed, the more difficult the task will be. It is usually best to clean panels in the area where they are struck.

2)  Transporting:

There are basic three methods recommended when transporting to the next floor:

                    i.      The heaviest and the longest, which is a full height wall panel, can be carried up the nearest stairway.

                  ii.   Passes through void areas.

                iii.      Rose through slots specially formed in the floor slab for this purpose. Once they have served their purpose they are closed by casting in concrete filter.

3) Striking:

Once cleaned and transported to the next point of erection, panels should be stacked at right place and in right order.

Proper stacking is a clean sign of a wall – managed operation greatly aids the next sequence of erection as well as prevents clutters and impend other activities.

                                                                                                                                                                                                                                                                                                                                                                                                                                       ON CONCRETE ACTIVITIES:

At least two operatives should be on stand by during concreting for checking pins, wedges and wall ties as the pour is in progress. Pins, wedges or wall ties missing could lead to a movement of the formwork and possibility of the formwork being damaged. This – effected area will then required remedial work after striking of the formwork.

Things to look for during concreting:

                                                        i.            Dislodging of pins / wedges due to vibration.

                                                      ii.            Beam / deck props adjacent to drop areas slipping due to vibration.

                                                    iii.            Ensure all bracing at special areas slipping due to vibration.

                                                     iv.            Overspill of concrete at window opening etc.

 

PRE-CONCRETE ACTIVITIES:

Before commencing the operation, ensure the following equipment has been procured:-

a) Scaffold brackets and all the necessary fixings.

b) Scaffolding bracket, vertical safety post.

c) Safety harness and all materials for the platform decking and handrails.

d) Timber and all materials for the platform decking and handrails.

 

            For the initial set up of the formwork and when using the wall mounted scaffold brackets, 20mm diameter holes require to be drilled through the formwork to position the PVC sleeves, which when cast in the concrete should be used for fixing the scaffold brackets. This hole also accommodates the bolting up of the formwork to control the alignment at the kicker level.

 

As the external formwork is being removed, a team of allocated people working in pairs will commence erecting the working platform. With the tie-rod through the hole provided in the working platform.  With the tie-rod through the hole providing in the working platform bracket, and using a small ladder, fix the bracket by pushing the tie rod through the PVC sleeve which is cast in the concrete. A helper inside the building can fix and tighten the locking nut.

During this operation, the person on the external must have his safety belt secured to the kicker above. As this operation progresses along the building, another pair of the team should follow, placing the decking, toe-board and handrails. One person should remain on the lower platform and pass the decking to his helper n the upper level

 

When working on the outside edge, safety equipment MUST be worn at all times.

INSTRUCTIONS:

To be imposed on every worker, are the following things not to be done:

·   Do not lay bottom panel contact face down, when starting a stack

·   Do not drop equipment from any height

·   Do not use panels as ramp, bridges or scaffold

·   Do not use hammer and wedges to pull panels together

·   Do not drive wedges until full length of panels are butted together

·   Do not use extreme hammer force when installing wedges

·   Do not erect elements not properly cleaned and oiled

(Deck panel faces are oiled after erection)

 

SAFETY:

 

a) Ensure all scaffold brackets are in good condition and have not been damaged since the last installation

b) Ensue platform is fully decked out and toe-board and handrail installed.

c) Penetration holes in the slab for transferring panels must be covered when not in use until cast with correct.

d) Any workers working above platform level must wear safety belt attached to a secured formwork component or the wall steel.

e)  When removing of the timber batons from the floor after    casting ensure no nails have been left exposed.

f)  Pins and wedges to be removed with care especially on the external of the building.

g) Handling of equipment.

h) Formwork should not be stacked on the scaffold.

 

POST – CONCRETE ACTIVITIES:

i) Strike Wall Form- It is required to strike down the wall form.

ii) Strike Deck Form- The deck form is then removed.

iii) Clean, Transport and stack formwork

iv) Strike Kicker Formwork – The kicker are removed.

v) Strike wall – Mounted on a Working Platform the wall are fitted on next                       floor.

vi) Erect Wall – Mount Working Platform and the wall is erected.

Normally all formwork can be struck after 12 hours.

 

                                             Erection of Platform

 

                                             Striking of formwork

 

 

        

                                              - Positioning of Platform

                    

                                          Removal of kicker

 

 

 

 

 

SITE MANAGEMENT

 

The essence of the system is that it provides a production line approach in the construction industry. The laborers are grouped together to form small teams to carry out various tasks within a certain time frame such as, reinforcement, fabrication and erection, formwork erection, concreting etc.

Scheduling involves the design and development of the work cycle required to maximize efficiency in the field. The establishment of a daily cycle of work, which when fully coordinated with different trades such as reinforcement fixing, mechanical services installation, and the placing of concrete, includes a highly efficient working schedule in the system, not just for formwork but for all parallel trades as well.

Optimum use of the labor force is made by ensuring that each trade has sufficient work on each working day. Experienced site supervisors are sent to site to train supervisory staff and labor for proper handling of the equipment and to assist in establishing the desired work cycle. The disciplined and efficient handling of work ensures that all other trades follow in a united and predetermined manner. The improved coordination and construction management enables the equipment to be used at optimum speed and efficiency and speed of the output are outstanding. Thus a disciplined and systemized approach to construction is achieved.

 

SPEED OF CONSTRUCTION

 

Work cycle

MIVAN is a system for scheduling & controlling the work of other connected construction trades such as steel reinforcement, concrete placements & electrical inserts. The work at site hence follows a particular sequence. The work cycle begins with the deshuttering of the panels. It takes about 12-15hrs.       It is followed by positioning of the brackets & platforms on the level. It takes about 10-15hrs simultaneously.

The deshuttered panels are lifted & fixed on the floor .The activity requires 7-10 hrs.Kicker & External shutters are fixed in 7 hrs. The wall shutters are erected in 6-8 hrs One of the major activity reinforcement requires 10-12 hrs. The fixing of the electrical conduits takes about 10 hrs and finally pouring of concrete takes place in these.

This is a well synchronized work cycle for a period of 7 days. A period of 10-12 hrs is left after concreting for the concrete to gain strength before the beginning of the next cycle. This work schedule has been planned for 1010-1080 sq m of formwork with 72-25cu m of concreting & approximate reinforcement.

The formwork assembling at the site is a quick & easy process. On leaving the MIVAN factory all panels are clearly labeled to ensure that they are easily identifiable on site and can be smoothly fitted together using formwork modulation drawings. All formwork begins from corners and proceeds from there.

The system usually follows a four day cycle: -

 

Day 1: -The first activity consists of erection of vertical reinforcement bars and one side of the vertical formwork for the entire floor or a part of one floor.

Day 2: -The second activity involves erection of the second side of the vertical formwork and formwork for the floor

Day 3: - Fixing reinforcement bars for floor slabs and casting of walls and slabs.    Day 4: -Removal of vertical form work panels after 24hours, leaving the props in place for 7 days and floor slab formwork in place for 2.5 days.

 

Design Aspects

 

The comparison is done between buildings constructed by: -

i)                    Conventional RC columns, beams, and slab construction (RC moment resisting frame        d structure)

OR

ii)                  RC load-bearing walls and slabs.

 

In the case of RC moment-resisting framed structures, the horizontal forces due to wind or earthquake are resisted by the frames resulting in the bending moments in columns to resist bending moment and vertical loads would be more than that required to resist vertical loads without bending moment. Similarly, additional reinforcement will be required in beams at supports.

In the case of RC load-bearing walls, monolithic casting of slab along with RC walls results in a box type structure, which is very strong in resisting horizontal forces due to wind or earthquake. In view of large depth of shear walls, the resulting stresses due to bending moment and vertical loads are smaller and in many cases, concrete alone is capable of resisting these forces.

On evaluating these alternatives, it is seen that the beam column frame system in

i)                    Performs poorly against earthquake forces compared to RCC wall and slab construction. Recent changes in the IS Codes, as well as recommended good practice demand provision of additional reinforcement comply with ductility requirements.

ii)                  The sizing and detailing of columns needed to be –that they are 20% stronger than beams they support.

 

Economics

 

Comparative costs of building using load bearing wall and slab system and conventional framed system of column, beams, slab for the construction of a ground-plus-seven building is given in Table 3.8.1. It can be seen that the total cost of ground-plus-seven building using MIVAN System is Rs.5344/m² which is lower than that in conventional system is Rs.6034/m².( As calculated by Srinivaschar.P.H, July 2005).

The cost per flat (or per m² built up area) using MIVAN shuttering system depends upon the number of repetition and period of completion of the project. As the formwork can be reused over 250 times, the initial cost per unit of forming area is less when compared to traditional methods. The reduction of cost is also due to the elimination of brickwork and plaster and also due to reduction in time. The cost of the project gets substantially reduced due to shear wall construction. These are due to the reduced consumption of steel, masonry, and plaster even though the use of concrete decreases. For the same number of repetition, the cost will be less if the period of completion is longer. This is because for a shorter completion period, the area of formwork is more than required for longer completion period. Cost of formwork is illustrated in Table no.3.8.2.

The aluminium formwork provides an integrated scaffolding system which reduces the cost of scaffolding requirements. The mechanical and electrical installation is simplified as conduits are embedded in the structure by precise engineering of outlets and service ducts.

Thus, we can conclude that the overall cost of the project is lesser when compared to project using traditional methods of formwork.

 

 

 

QUALITY:

High quality Formwork panels ensure consistency of dimensions. On the removal of the formwork mould a high quality concrete finish is produced to accurate tolerances and verticality. The high tolerance of the finish means that no further plastering is required. Typically a 3mm to 4mm skin coat is applied internally prior to finishing and a 6mm build up coat prior to laying tiles. Care must be taken so that the concert and in particular the enforcement does not become contaminated due to excessive or negligent application of the releasing agent.

 

The Advantages of this system are:-

The MIVAN formwork is specifically designed to allow rapid construction of all types of architectural layouts.

1)      Total system forms the complete concrete structure.

2)      Custom designed to suit project requirements.

3)      Unsurpassed construction speed.

4)      High quality finish.

5)      Cost effective.

6)      Panels can be reused up to 250 times.

7)      Erected using unskilled labor.

 

Quality and speed must be given due consideration along with economy. Good quality construction will never deter to projects speed nor should it be uneconomical. In fact, time consuming repairs and modifications due to poor quality work generally delay the job and cause additional financial impact on the project. Some experts feel that housing alternatives with low maintenance requirements may be preferred even if the initial cost is high.

 

LIMITATION OF MIVAN FORMWORK:

 

Even though there are so many advantages of MIVAN formwork the limitations cannot be ignored. However the limitations do not pose any serious problems. They are as follows: -

 

1)      Because of small sizes finishing lines are seen on the concrete surfaces.

2)      Concealed services become difficult due to small thickness of components.

3)      It requires uniform planning as well as uniform elevations to be cost effective.

 

4)      Modifications are not possible as all members are caste in RCC.

 

5)      Large volume of work is necessary to be cost effective i.e. at least 200 repetitions                          of the forms should be possible at work.

 

6)      The formwork requires number of spacer, wall ties etc. which are placed @ 2 feet                          c/c; these create problems such as seepage, leakages during monsoon.

 

7)      Due to box-type construction shrinkage cracks are likely to appear.

 

8)      Heat of Hydration is high due to shear walls.

 

REMEDIES

In external walls, ties used in shutter connection create holes in wall after deshuttering. These may become a source of leakage if care is not taken to grout the holes. Due to box-type construction shrinkage cracks are likely to appear around door and window openings in the walls. It is possible to minimize these cracks by providing control strips in the structure which could be concreted after a delay of about 3 to 7 days after major concreting. The problem of cracking can be avoided by minimizing the heat of hydration by using fly ash.

COMPONENT CODES

ITEM

CODE

DESCRIPTION

1

B

BEAM SIDE

2

BB

BEAM BAR

3

BCA

50 INTERNAL BEAM CORNER

4

BCB

75 INTERNAL BEAM CORNER

5

BCC

100 INTERNAL BEAM CORNER

6

BCD

125 INTERNAL BEAM CORNER

7

BCE

150 INTERNAL BEAM CORNER

8

BCF

175 INTERNAL BEAM CORNER

9

BEA

50 EXTERNAL BEAM CORNER

10

BEB

75 EXTERNAL BEAM CORNER

11

BEC

100 EXTERNAL BEAM CORNER

12

BED

125 EXTERNAL BEAM CORNER

13

BEE

150 EXTERNAL BEAM CORNER

14

BEF

175 EXTERNAL BEAM CORNER

15

BF

VERTICAL BEAM FILLER

16

BH

VERTICAL BULK HEAD

17

BHH

HORIZONTAL BULK HEAD

18

BP

BEAM PROP

19

BPP

BEAM PROP WITH 2 PROPS

20

BS

BEAM SOFFIT PANEL

21

BZ

50 HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

22

BZB

75 HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

23

BZC

100 HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

24

BZD

125  HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

25

BZE

150 HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

26

BZF

175 HIGH THREE SIDED BEAM CORNER WITH 100mm ON ONE END

27

CC

COLUMN COLLAR-125 HIGH *100 WIDE

28

CD

COLUMN COLLAR-125 HIGH *125 WIDE

29

CE

COLUMN COLLAR-150 HIGH *150 WIDE

30

CLA

INTERNAL-100 ON LEFT LEG  (FOR25mm ROCKER)

31

CLB

INTERNAL-100 ON LEFT LEG  (FOR50mm ROCKER)

32

CLC

INTERNAL-100 ON LEFT LEG  (FOR75mm ROCKER)

33

CLD

INTERNAL-100 ON LEFT LEG  (FOR100mm ROCKER)

34

CP

CHANNEL PROP HEAD

35

CPP

CHANNEL PROP HEAD WITH 2 PROPS

36

CRA

INTERNAL CORNER-100 ON RIGHT LEG (FOR 25mm ROCKER)

37

CRB

INTERNAL CORNER-100 ON RIGHT LEG (FOR 50mm ROCKER)

38

CRC

INTERNAL CORNER-100 ON RIGHT LEG (FOR 75mm ROCKER)

39

CRD

INTERNAL CORNER-100 ON RIGHT LEG (FOR 100mm ROCKER)

40

D

DECK PANEL

41

DF

DECK FILLER

42

DP

DECK PROP HEAD

43

EB

END BEAM

44

EC

EXTERNAL CORNER

45

ECB

HORIZONTAL EXTERNAL CORNER

46

EP

END PROP HEAD

47

IC

INTERNAL CORNER

48

ICA

INTERNAL CORNER-(FOR 25mm ROCKER)

49

ICB

INTERNAL CORNER-(FOR 50mm ROCKER)

50

ICC

INTERNAL CORNER-(FOR 75mm ROCKER)

51

ICD

INTERNAL CORNER-(FOR 100mm ROCKER)

52

ICL

INTERNAL CORNER-100 ON LEFT LEG

53

ICR

INTERNAL CORNER-100 ON RIGHT LEG

54

K

KICKER

55

KB

100 INTERNAL KICKER CORNER

56

KBE

100 EXTERNAL KICKER CORNER

57

KC

125 INTERNAL KICKER CORNER

58

KCE

125 EXTERNAL KICKER CORNER

59

KD

150 INTERNAL KICKER CORNER

60

KDE

150 EXTERNAL ICKER CORNER

61

KE

175 EXTERNAL KICKER CORNER

62

KEE

175 INTERNAL KICKER CORNER

63

LS

SOFFIT LENGTH-100 HEIGHT ON VERTICAL FACE(INVERTED)

64

LSB

AS ABOVE WITH 100*100mm  END PLATES ON EITHER END

65

LSL

AS ITEM 63 WITH 100*100mm END PLATE ON L.H.S ONLY

66

LSR

AS ITEM 63 WITH 100*100mm END PLATE ON R.H.S ONLY

67

MB

MID BEAM

68

PC

PLATE COVER TO WINDOW SILL

69

PL

PROP LENGTH

70

PLB

PROP LENGTH  BASE 

71

RK

ROCKER

72

SB

SOFFIT BEAM (ACCOMODATES UPTO A MAXIMUM BEAM WIDTH 300mm)

73

SBE

100 HIGH*100  WIDE SOFFIT CORNER EXTERNAL

74

SBX

100 HIGH*100  WIDE SOFFIT CORNER INTERNAL

75

SBY

100 SOFFIT CORNER WITH RIGHT LEG MITRED

76

SBZ

100 SOFFIT CORNER WITH LEFT LEG MITRED

77

SC

125 HIGH *100 WIDE SOFFIT CORNER

78

SCE

125 HIGH *100 WIDE EXTERNAL CORNER

79

SCY

125 SOFFIT CORNER WITH RIGHT LEG MITRED

80

SCZ

125 SOFFIT CORNER WITH  LEFT LEG MITRED

81

SD

150 SOFFIT CORNER                             

82

SDE

150 HIGH*100  WIDE SOFFIT CORNER EXTERNAL

83

SDY

150 SOFFIT CORNER WITH RIGHT LEG MITRED

84

SDZ

150 SOFFIT CORNER WITH LEFT LEG MITRED

85

SF

SOFFIT FILLER

86

SL

125 HIGH *100 WIDE SOFFIT LENGTH

87

SLB

SOFFIT LENGTH WITH 100 RETURN ON BOTH ENDS

88

SLR

SOFFIT LENGTH WITHOUT LIP

89

SM

125 HIGH *125 WIDE SOFFIT LENGTH

90

SMB

125 HIGH *125 WIDE SOFFIT LENGTH WITH 125 RETURN ON BOTH ENDS

91

SMC

125 HIGH *125 WIDE SOFFIT CORNER

92

SME

125 HIGH *125 WIDE SOFFIT CORNER  EXTERNAL

93

SMR

125 HIGH *125 WIDE SOFFIT CORNER WITHOUT LIP

94

SN

125 HIGH *150 WIDE SOFFIT LENGTH

95

SNB

125 HIGH *150 WIDE SOFFIT LENGTH WITH 150 RETURN ON BOTH ENDS

96

SNC

125 HIGH *150 WIDE  SOFFIT CORNER

97

SNE

125 HIGH *150 WIDE  SOFFIT CORNER EXTERNAL

98

SNR

125 HIGH *150 WIDE  SOFFIT LENGTH WITHOUT LIP

99

SX

25/50 SOFFIT BEAM CORNER

100

SXB

25/50 SOFFIT BEAM CORNER WITH 125/150 RETURN ON BOTH ENDS

101

SXL

25/50 SOFFIT BEAM CORNER WITH 125/150 RETURN ON LEFT END

102

SXR

25/50 SOFFIT BEAM CORNER WITH 125/150 RETURN ON RIGHT END

103

T

TOP PANEL(ABOVE STANDARD WALL PANEL)

104

W

WALL PANEL

105

WF

HORIZONTAL WALL FILLER

106

WRA

VETICAL WALL FILLER WITH BOTTOM MITRED (FOR 25 mm ROCKER)

107

WRB

VETICAL WALL FILLER WITH BOTTOM MITRED (FOR 50 mm ROCKER)

108

WRC

VETICAL WALL FILLER WITH BOTTOM MITRED (FOR 75 mm ROCKER)

109

 

WRD

VETICAL WALL FILLER WITH BOTTOM MITRED (FOR 100 mm ROCKER)

110

WX

WX-PANEL OR WX- FILLER

111

WXR

WX-FILLER WITH BOTTOM MITRED

 

 

 

CASE STUDY

 

            The Bombay municipal corporation (BMC) are responsible for the development of Mumbai. It has undertaken  massive projects to achieve this goal and has encouraged use of  latest technologies to complete these projects. In recent years it has undertaken large – scale constructions of houses in  Mumbai.

 

 

completed Project with mivan FORMWORK:-

 

 

SRA AT MAHUL

 

Location:                          MAHULVILLAGE KURLA

Country:                          India.

Client:                               DB REALITY

Scope:                               7 Storey, 68 Apts.

Design:                             Load Bearing wall & slab.

Cycle:                               11 days per floor.

System formwork:          51.76 laks sq.mt.

Contract Start Date:       July 2007.

Project Type (s):              High rise, residential building having 68 buildings in all.

Architect:                         SHAH & DUMASIA CONSULTANCY PVT LTD.

 

 

SHUTTERING FOR EXTERNAL WALLS

DESCRIPTION

SIZES

NOS

TOTAL

WALL PANEL

1.20m*2.05m

12

24

 

0.90m*2.05m

3

6

 

0.60m*2.05m

7

14

 

0.75m*2.05m

3

6

 

0.90m*0.85m

7

14

 

0.60m*0.85m

7

14

 

0.25m*2.05m

1

2

 

0.95m*2.05m

2

4

 

0.3m*2.05m

1

2

 

0.5m*2.05m

8

16

 

1.2m*0.85m

3

6

 

1.0m*2.05m

2

4

 

 

 

 

TOP PANEL

1.20m*0.95m

12

24

 

0.90m*0.95m

6

12

 

0.60m*0.95m

7

14

 

0.75m*0.95m

3

6

 

0.90m*0.95m

7

14

 

0.60m*0.95m

7

14

 

0.25m*0.95m

1

2

 

0.95m*0.95m

2

4

 

0.3m*0.95m

1

2

 

0.5m*0.95m

8

16

 

1.2m*0.95m

3

6

 

1.0m*0.95m

5

10

 

 

 

 

KICKER

1.20m*0.1m

1

2

 

0.90m*0.1m

1

2

 

0.60m*0.1m

1

2

 

0.75m*0.1m

1

2

 

0.90m*0.1m

1

2

 

0.60m*0.1m

1

2

 

0.25m*0.1m

1

2

 

0.95m*0.1m

1

2

 

0.3m*0.1m

1

2

 

0.5m*0.1m

1

2

 

1.2m*0.1m

1

2

 

1.0m*0.1m

1

2

 

 

 

 

SOFFIT LENGTH (SL)

0.9m*0.1m

7

14

 

0.6m*0.1m

7

14

 

1.2m*0.1m

7

14

 

 

 

 

HORIZONTAL BULK HEAD (BHH)

0.9m*0.1m

7

14

 

0.6m*0.1m

7

14

 

1.2m*0.1m

7

14

 

1.0m*0.1m

7

14

 

 

 

 

VERTICALBULK HEADS (BH)

0.9m*0.1m

14

28

 

0.6m*0.1m

14

28

 

1.2m*0.1m

14

28

 

1.0m*0.1m

14

28

 

 

 

 

DOOR SPACERS

1.0m*0.05m

7

14

 

 

 

 

PROP BASE LENGTH (PLB)

1.2m*0.05m

7

14

 

1.2m*0.05m

7

14

 

1.2m*0.05m

7

14

 

 

 

 

WALL TIES

 

2500

2500

 

 

 

 

STUB PINS

 

3500

3500

 

 

 

 

EXTERNAL CORNERS

0.1m*0.1m*3.0m

2

4

 

 

 

 

COLUMN PANELS

 

 

 

C-17

0.5m*0.225m

1

2

C-21

0.7m*0.225m

1

2

C-22

0.7m*0.225m

1

2

C-41

0.4m*0.4m

1

2

C-1

0.7m*0.225m

1

2

C-45

0.55m*0.225

1

2

 

 

internal walls

 

 

 

Hall

 

 

 

DESCRIPTION

SIZES

NOS

TOTAL

wall panel

600*2050

14

98

top plate

600*550

14

98

wall panel

300*2050

5

35

top plate

300*550

5

35

wall panel

225*2050

1

7

top plate

225*550

1

7

Kicker

600*100

14

98

Kicker

300*100

5

35

Kicker

225*100

1

7

soffit length

600*175

14

98

soffit length

300*175

5

35

soffit length

225*175

1

7

 

 

 

 

Slab

 

 

 

deck panel

450*110

16

112

deck panel

300*1100

2

14

deck panel

450*750

8

56

deck prop

200

4

28

prop length

2675

4

28

 

 

 

 

Kitchen

 

 

 

wall panel

375*1825

1

7

wall panel

600*900

1

7

wall panel

300*900

1

7

wall panel

245*2050

1

7

wall panel

600*1975

3

21

Kicker

375*100

1

7

Kicker

600*100

1

7

Kicker

300*100

1

7

Kicker

245*100

1

7

Kicker

600*100

3

21

soffit length

375*175

1

7

soffit length

600*175

1

7

soffit length

300*175

1

7

soffit length

245*175

1

7

soffit length

600*175

3

21

Slab

 

 

 

deck panel

400*800

7

49

deck panel

425*800

1

7

deck panel

270*895

1

7

deck panel

95*450

3

21

deck panel

270*800

1

7

deck prop

200

2

14

prop length

2675

2

14

 

 

 

 

bath room

 

 

 

wall panel

259*2075

1

7

wall panel

120*2075

1

7

wall panel

225*2050

1

7

top panel

225*300

1

7

top panel

300*300

1

7

top panel

300*250

1

7

soffit length

225*175

1

7

soffit length

300*175

2

14

Slab

 

 

 

deck panel

450*1020

2

14

deck panel

355*1020

2

14

deck panel

950*950

1

7

deck panel

80*250

1

7

deck panel

450*950

1

7

deck panel

80*450

1

7

deck prop

200

2

14

prop length

2675

2

14

 

 

 

 

concluSion:

 

The task of housing due to the rising population of the country is becoming increasingly monumental. In terms of technical capabilities to face this challenge, the potential is enormous; it only needs to be judiciously exploited.

Civil engineers not only build but also enhance the quality of life. Their creativity and technical skill help to plan, design, construct and operate the facilities essential to life. It is important for civil engineers to gain and harness the potent and versatile construction tools.

Traditionally, construction firms all over the world have been slow to adopt the innovation and changes. Contractors are a conservative lot. It is the need of time to analyze the depth of the problem and find effective solutions. MIVAN serves as a cost effective and efficient tool to solve the problems of the mega housing project all over the world. MIVAN aims to maximize the use of modern construction techniques and equipments on its entire project.

We have tried to cover each and every aspect related to aluminium (MIVAN) form construction. We thus infer that MIVAN form construction is able to provide high quality construction at unbelievable speed and at reasonable cost. This technology has great potential for application in India to provide affordable housing to its rising population.

Thus it can be concluded that quality and speed must be given due consideration with regards to economy. Good quality construction will never deter to projects speed nor will it be uneconomical. In fact time consuming repairs and modification due to poor quality work generally delay the job and cause additional financial impact on the project. Some experts feel that housing alternatives with low maintenance requirements may be preferred even if at the slightly may preferred even if at the higher initial cost.

 

 

 

 

 

 

 

 

273 comments:

  1. I am really looking forward to part 2 of this Blog
    mild steel plate

    ReplyDelete
  2. Just desire to say your article is as amazing.
    The clarity for your submit is just great
    and i could suppose you're a professional on this subject. Well with your permission let me to snatch your feed to keep up to date with coming near near post. Thanks 1,000,000 and please keep up the gratifying work.

    My blog ... www.zpdingen.nl

    ReplyDelete
  3. Just desire to say your article is as amazing. The clarity
    for your submit is just great and i could suppose you're a professional on this subject. Well with your permission let me to snatch your feed to keep up to date with coming near near post. Thanks 1,000,000 and please keep up the gratifying work.

    My web-site; www.zpdingen.nl

    ReplyDelete
  4. You're so cool! I don't think I have read through something like this before.
    So wonderful to discover another person with some genuine thoughts on this topic.
    Seriously.. many thanks for starting this up. This website is something
    that is required on the web, someone with a bit of originality!


    Feel free to surf to my page: mederma stretch mark therapy reviews

    ReplyDelete
  5. Shuttering material always utility by the civil engineer while making a building or construction work. For this we are offering various shuttering utility on rental basis. If anyone need, you may contact us shuttering material on hire

    ReplyDelete
    Replies
    1. dear sir, Iam looking for aiuminium form work for 18 storey building in bangalore.
      My mail ID: kumarsrgm12@gmail.com cell:9944194560

      Delete
  6. thanks for sharing..Amazing stuff continues the good work.
    plastic concrete forms

    ReplyDelete
  7. Hello my friend! I would like to tell you that this write-up is awesome, great written and include almost all important info. I recently came to know about www.bofuform.com/, their Modular Column Formwork are very effective.
    Modular Column Formwork

    ReplyDelete
  8. have read many blogs in the net but have never come across such a well written blog. Good work keep it up
    plastic walls

    ReplyDelete
  9. It's really a nice and helpful piece of information. I'm glad that you shared this helpful info with us. Please keep us informed like this.
    wooden garden decorations

    ReplyDelete
  10. Great ....You have beautifully presented your thought in this blog post. I admire the time and effort you put into your blog and detailed information you offer.
    san diego demolition contractors

    ReplyDelete
  11. Really!!! I am very impressed after reading this blog. thanks for providing deep information for
    Commercial Construction Jacksonville

    ReplyDelete
  12. Truly superb blog, I don’t have actual words to praise in regards for this
    trade show displays

    ReplyDelete
  13. It was another joy to see your post. It is such an important topic and ignored by so many, even professionals. I thank you to help making people more aware of possible issues. Great stuff as usual...
    injection mold design uk

    ReplyDelete
  14. "Thanks for your refreshingly straight talk on this amazing topic .
    "
    polymer extrusion uk

    ReplyDelete
  15. Very good bog posted, I like it the most. This blog really explain a complete detail about form work.As we all know form work is also known as shuttering and scaffolding material work that involves in building huge construction with less time span and cost.

    ReplyDelete
  16. This is an informative blog which has a detailed description of the the top builders in bhopal is among the best builders in bhopal
    who has the property in every direction of Bhopal Their rates are also than others and the quality is remarkable.

    ReplyDelete
  17. Anyone who want cement removing chemical from Mivan Shuttering may contact @ sarincorporation@gmail.com

    ReplyDelete
  18. THANKS FOR SHARING SUCH A AMAZING CONTENT
    GREAT PIECE OF WORK!!!
    REALLY APPRECIATE YOUR WORK!!!
    TOP SOLUTIONS
    TOP SOLUTIONS USA

    ReplyDelete
  19. Great blog post...very informative. Keep sharing on more.
    We provides a best scaffold to all industries with the wide range of sizes from industrial building, towers to large scale applications.
    Scaffolding contractor thompson
    Mobile scaffolding platforms thompson

    ReplyDelete
  20. Thanks A Lord For Publish In Your Blog, This Is A Great Things To Learned Many Information. Keep Posting Many Blogs Like This.
    aluminium scaffolding dealers in chennai

    ReplyDelete
  21. Beemainfratech are extremely immersed in manufacturing an inclusive range of Aluminium Scaffolding Dealers in Chennai, Tower Ladder, Step Ladder, Aluminium Ladder and FRP Ladder.Beema Infratech is one of the Scaffolding Dealers in Chennai.

    ReplyDelete
  22. Great blog ! I really like your blog. Your blog is very informative. Thanks for sharing such a useful blog. Paraflex is leading Best Top Aluminium Wire Manufacturers in India in India, certified by BIS, ISO, NSIC, SSI. We provide you housing wire, Industrial Wire Manufacturers, aluminium cable, cctv cable etc. of best quality and all cables are available at the best price.

    ReplyDelete
  23. Very informative piece of article, this blog has helped me to understand the concept even better and good for use. Keep on blogging.
    Aluminium Scaffolding Dealers in Chennai

    ReplyDelete

  24. It is very nice article on that topic. I was looking for something like which is interesting and knowledgeable. Do you know that Agrawal Construction Company has the most amazing townships, especially best Builders In Bhopal, with the name Sagar Green Hills. It is located in the lap of nature.

    ReplyDelete
  25. Tavara Mines & Minerals is a Bangalore based company providing a wide range of mining-related services. Established in 2011, the company has been providing outstanding services to customers all over Karnataka.
    Manufacturing Sand in Bangalore

    ReplyDelete
  26. Really a amazing post..very informative.
    We provides a best scaffold to all industries with the wide range of sizes from industrial building, towers to large scale applications.
    Garbage chute saskatchewan
    Scaffolding contractor thompson

    ReplyDelete
  27. Manufactured Sand with the granule thickness of 0 - 2.36 mm is suitable for all plastering purposes and is used across all segments such as Independent Houses, Apartments and other Residential & Commercial Projects. Plastering sand need not be filtered again at site hence it can be used directly to prepare the mortar which saves labour time and money.
    Manufacturing Sand for Plastering in Bangalore

    ReplyDelete
  28. Such a nice peice of information. Summed up all the things in a perfect way.
    grease chassis

    ReplyDelete
  29. This is one of the best article in this blog,thanks for sharing information about scaffolding ladders in google chrome browser...
    aluminium scaffolding dealers in chennai
    scaffolding dealers in chennai

    ReplyDelete
  30. Thanks for the update. I really appreciate the efforts you have made for this blog.
    All the best !!!

    corrugated steel pipe
    structural plate
    CSP culvert

    ReplyDelete
  31. I absolutely love that it looks so beautiful on you This is a great post it was very informative. I look forward in reading more of your work. Also I made sure to

    bookmark your website. I enjoyed every moment of reading it. More info please visit
    Aluminum Scaffolding Dubai.
    Scaffolding on Hire Dubai
    Aluminum Scaffolding Ladders UAE
    Aluminum Scaffolding Building Materials UAE
    Scaffolding Rental Dubai
    Steel Scaffolding Rental UAE

    ReplyDelete
  32. Ready mixed concrete provides customers with unique service quality due to the availability of a large number of concrete mixer trucks which enable delivery rates to be kept under control supply of special services for difficult worksites like pumps, conveyors, etc the ability to adapt the pace of deliveries to the customer's needs
    Ready mix concrete in JP Nagar Bangalore

    ReplyDelete
  33. This comment has been removed by the author.

    ReplyDelete
  34. I am happy to find this post very useful for me, as it contains lot of information. I always prefer to read the quality content and this thing I found in you post. Click here to get further information here regarding Heavy Equipment Service Manual. Thanks for sharing.

    ReplyDelete
  35. A very high level post. Thanks you for giving me such a nice information. Click here for further information regarding Heavy Equipment Service Manual. I think this will be really useful for you.

    ReplyDelete
  36. Ready mixed concrete provides customers with unique service quality due to the availability of a large number of concrete mixer trucks which enable delivery rates to be kept under control supply of special services for difficult worksites like pumps, conveyors, etc the ability to adapt the pace of deliveries to the customer's needs
    Ready mix concrete in Bangalore

    ReplyDelete
  37. Thank you for the informative post. This is excellent information. It is amazing and wonderful to visit your site. Checkout the link for Remodeling Contractors Vancouver BC at our website.

    ReplyDelete
  38. We need the Aluminum panels to buy for our own use in our construction projects. Also we need rental basis. Kindly send the quote for the standard panels. Mobile: +91-7358715956
    aravindan.kp@townandcitydevelopers.com
    Town & City Developers, KG House, 126, Arts College Road, Coimbatore – 641018. TamilNadu, India
    Ph: +91-422-4343434, Ext.: 520 GST No: 33AAGFT8799R1ZX

    ReplyDelete
  39. Ready mixed concrete provides customers with unique service quality due to the availability of a large number of concrete mixer trucks which enable delivery rates to be kept under control supply of special services for difficult worksites like pumps, conveyors, etc the ability to adapt the pace of deliveries to the customer's needs
    Ready mix concrete in Bangalore

    ReplyDelete
  40. Useful Information! Thank you for sharing unique and different information of aluminium formwork. PaamGroup provides Plywood Formwork Panels Manufacture.

    ReplyDelete
  41. Woah! I'm really digging the template/theme of this site. It's simple, yet effective. A lot of times it's difficult to get that "perfect balance" between usability and appearance. I must say you have done a superb job with this. Also, the blog loads super fast for me on Internet explorer. Excellent Blog!
    double vertical radiator

    ReplyDelete
  42. Thank you for all of the hard work on this site. Debby delights in getting into internet research and it is easy to understand why. A number of us learn all regarding the dynamic ways you give informative strategies via the blog and in addition invigorate participation from other people on this concept so our simple princess has been being taught a lot. Take advantage of the rest of the new year. You're performing a brilliant job.
    modern cast iron radiators

    ReplyDelete
  43. Very nice information..Thanks for the amazing post.
    We provides a best scaffold to all industries with the wide range of sizes from industrial building, towers to large scale applications.
    chute for rent in thunderbay
    Scaffolding contractor thompson

    ReplyDelete
  44. Creativity of writer is purely impressive. It has touched to the level of expertise with his writing. Everything is up to the mark. Written perfectly and I can use such information for my coming assignment.Precast Concrete Companies in saudi arabia

    ReplyDelete
  45. Thank you for your post. This is excellent information. It is amazing and wonderful to visit your site.
    Die casting manufacturer

    ReplyDelete
  46. NEO Thermal is well Known Thermal Insulation Material Suppliers in HyderabadThere are few Benefits of Thermal insulation material suppliers whose material you should use.We are the first in India to introduce a 7 layer air bubble insulation of superior quality.

    ReplyDelete
  47. Construction Projects data Base UAE, Dubai

    Welcome to the Wida supplier, WIDA is the construction Intelligence agency in Dubai, UAE that provides the best building material and construction projects database service. Contact us now - +971 4 399 24 20

    to get more - https://wida-me.com

    ReplyDelete
  48. Thanks for this. I really like what you've posted here and wish you the best of luck with this blog and thanks for sharing.duct shaft doors manufacturer in hyderabad

    ReplyDelete
  49. Useful Blog! You shared about Formwork in detail. Components are important of formwork.
    PAAM GROUP leading manufacturer and supplier of building Materials in Hyderabad.

    ReplyDelete
  50. ATN Worldwide, LLC is a long listing platform that matches the Grease supplier in Dubai. Get high quality and assured Grease online at the best price offering multiple buying options for brake fluid. Grease Suppliers Dubai .

    ReplyDelete
  51. I was scrolling the internet like every day, there I found this article which is related to my interest. The way you covered the knowledge about the subject and the 2 BHk Flat Ayodhya Bypass Road Road
    was worth to read, it undoubtedly cleared my vision and thoughts towards B 3 BHk Flat in Ayodhya Bypass Road
    . Your writing skills and the way you portrayed the examples are very impressive. The knowledge about 4 bhkflats in Ayodhya Bypass Road
    is well covered. Thank you for putting this highly informative article on the internet which is clearing the vision about top builders in Bhopal and who are making an impact in the real estate sector by building such amazing townships.

    ReplyDelete
  52. To know various types of formwork you need to know how many types are there as you can find on internet or other source that there are numerous types of formwork available in market but the most used formwork is Aluminium Formwork System as it is stronger than other formworks.

    ReplyDelete
  53. Are you searching for Best Industrial Uniform Supplier in Dubai ?ATN Worldwide, LLC the best Industrial Uniform Supplier in Dubai .We offer High Quality Satisfaction without any compromises. We have a great client’s reputation and offering quality services to our clients.

    ReplyDelete
  54. Thanks for sharing this information
    Choudhary Scaffolding In Bangalore: Manufacturer of scaffolding parts In Bangalore. Also provides Scaffolding services on Rental basis, serves all over Bangalore.

    SCAFFOLDING BASE PLATE
    CUP LOCK SCAFFOLDING
    SCAFFOLDING JACK
    SCAFFOLDING PLATFORM
    SCAFFOLDING FITTINGS

    ReplyDelete
  55. Thanks for the information..

    Check out it once.

    ReplyDelete
  56. Excellent blog,
    Really, you are sharing a nice article which is very interesting and useful for us. I pay the special thanks to you.
    Aluminium sheet and chemicals in UAE

    ReplyDelete
  57. it's really cool blog. Linking is very useful thing.you have really helped brass copper bronze gears

    ReplyDelete
  58. I have a mission that I’m just now working on, and I have been at the look out for such information Aluminium ramen

    ReplyDelete
  59. A lot of thanks for all of the labor on this site. My mother really likes participating in research and it is easy to understand why. All of us notice all about the compelling form you provide simple guides via your blog and even boost contribution from some other people on this situation and our daughter has always been discovering a lot. Have fun with the rest of the new year. Your conducting a fantastic job.
    flooring specialist in Southend

    ReplyDelete
  60. Nice Blog!!!

    Cornerstone Walls Solutions offer wall blocks retaining wall products, solutions & systems at affordable rates. For more info, fill the quick enquiry box.

    ReplyDelete
  61. Building Constructions Services

    Welcome to Super Venture, Get the best building constructions services in South African. We specialized in constructions in the commercial, industrial and residential markets. We offer the building renovations & constructions services.

    ReplyDelete
  62. Thanks for sharing such a great article and it's helpful for everyone. Great Post!

    Square Jali Manufacturer in Jagadhri

    ReplyDelete
  63. Excellent post! Thanks for sharing such useful information for us.
    acoustic enclosure suppliers uae

    ReplyDelete
  64. I like what you guys are up too. This sort of clever work and coverage! Keep up the great works guys I've added you guys to my own blogroll.
    safety decking

    ReplyDelete
  65. thank you so much for this amazing blog similar i have also want to read so click here plywood manufacturers in India

    ReplyDelete
  66. Great post !! Thanks for sharing valuable content.
    Click here to know more Real estate companies in Bangalore

    ReplyDelete
  67. I always like and such a super contents of these post, Good info I gained more information about that. Thanks for such a helpful information. Keep it up.
    https://indusdesignworks.com/online-cad-freelance.php
    Outsource 3d rendering

    ReplyDelete
  68. Fabtary is a Professional Website Design Agency in Umhlanga, Ballito, Durban, Cape Town.
    We are Top Digital Marketing Agency in Umhlanga, Ballito, Durban. We Offer Digital Marketing Service like Social media marketing Umhlanga, Baillito, Durban.
    Get information visit here Top Digital Marketing Agency in Umhlanga, Ballito, Durban

    ReplyDelete
  69. Glad to found your blog post about mivan aluminium formwork. Thanks for sharing with us. We are also one of the leadingaluminium facade company in UAE. We know how tought is to setup aluminium structure on big skyscraper type buildings.

    ReplyDelete
  70. Nice blog..
    https://ayushrun.blogspot.com/p/blog-page.html?showComment=1601910461585

    ReplyDelete
  71. Love your site. My thanks for doing such a good job. I will come back to read more and inform my coworkers about your site.

    Visit Here : Structural Engineers in Coimbatore

    ReplyDelete
  72. Glad to read such an amazing article on Mivan technology, I am planning to construct a Low rise building (G+4 Storeyed) in a 600 square feet space using this Technology.

    I just have a slight clarification that can I construct using this Technology if my plot is surrounded by walls at 3 sides, viz I have buildings already constructed to the right, left and backside of my plot ?

    What are the steps involved in foundation Slab for a building using Mivan Technology ?

    Looking forward to hear from you soon.

    Thanking you in anticipation.

    Kind Regards,
    Abrar

    ReplyDelete
  73. Now this is in actual fact cooperative. It’s very openhanded of you to share this with us. Would you like to get more information about Mould services so just visit our site. Mould Removal in Sydney Mould removal Sydney

    ReplyDelete
  74. Thank you for such information. Are you thinking of fitting an outdoor umbrella in your vast garden? If yes, then My Canvas Connection is the right place to consider. We have the top-quality Outdoor Umbrella Singapore which can enhance the look of your garden to keep you safe from the sun and rain it resists in any type of climatic condition

    ReplyDelete
  75. Interesting Article. Find Home Builders in Alabama with GetNewHomeRebateRealty and get assure rebate on successful purchase.

    ReplyDelete
  76. Thanks for delivering this post. It provides best value content. At ResidentialAlabama get the best offers regarding Home for Sale in Alabama with lowest ever price in United States.

    ReplyDelete
  77. It seems interesting article. Find best property with PremierCoastRealty Real Estate Jacksonville fl and get amazing benefits.

    ReplyDelete
  78. There is so much great, useful information here. Thank you! Thank you! Thank you!
    https://indusdesignworks.com/
    Outsource Structural detailing

    ReplyDelete
  79. Thanks for sharing the post.
    I also got a post related Best Building Products Suppliers.

    ReplyDelete
  80. Looking for building material suppliers in UAE? Find list of verified building materials shop & stores who are dealing in construction material & building supplies.

    ReplyDelete
  81. Thanks for the update. I really appreciate the efforts you have made for this blog.
    All the best !!!
    Real Estate Florida

    ReplyDelete
  82. We are Aluminum Honeycomb Sandwich Panels Manufacturers in India, Our 3D Glass Fiber Sandwich panels have customized 3D Glass to meet your business & technical requirements. For more info call at 2241611200.

    ReplyDelete
  83. Hi..
    I appreciate your Informative post and thanks for sharing.

    MagnaMike 8600 – Bottle Thickness Gauge

    ReplyDelete
  84. I appreciate your Informative post - Real Estate Platform visit us.

    ReplyDelete
  85. I’m following the suggestions as mentioned in your blog found this blog which is related to my interest. The way you covered the knowledge about the subject and flats in chunabhatti bhopal
    was worth to read, it undoubtedly cleared my vision and thoughts towards duplex house In Bhopal

    ReplyDelete
  86. Nice Post! I appreciate to you for this post. I Read Your Blog Its a very nice information blog for me Really you are the best. Thank you for sharing...

    Drop Tester

    ReplyDelete
  87. Brahmani Aluminium commenced its operations in the year 2005 and is among the prominent manufacturers, suppliers, and exporters of Aluminium Industrial Products and Components. The products offered by us are manufactured at par with the defined industry standards, so as to increase their demand in the global market. Considering the diversity of our range, our products are used across various industries, including construction, building, and others. Some of the pertinent features of our range include durability, shock resistance, leakproofness, and resistance to moisture.
    Aluminium Section Door Window Fabricator in ahmedabad
    Aluminium Section Partition in ahmedabad
    False Ceiling Work in ahmedabad
    Upvc Door Window Manufacture in ahmedabad

    ReplyDelete
  88. I need Soldiers shuttering rental contractor plz call my num.8682938009 HMI project ..

    ReplyDelete
  89. Sealand Support is providing the best service of air condition & refrigerating systems in Cameroon. Keep your air-conditioner (AC) maintained and you’ll not only save money on energy, but you’ll also extend its lifespan, saving money on costly early replacement.

    ReplyDelete
  90. That's really awesome blog because i found there lot of valuable Information and i am very glad that you share this blog with us.
    Sunshade Tensile Coverings Manufacturers in Punjab
    Sunshade Tensile Coverings Manufacturers in Jalandhar

    ReplyDelete
  91. modern aluminum pergola miami - Out Door Pergolas Creating Your Backyard Oasis Request A Quote Features Rain and wind sensors automatically open and close the louvers to ensure protection against the elements. Built in LED lighting strips throughout that can be controlled with a remote as well a power switch.

    ReplyDelete
  92. With the vast experience of international market with the reputed Steel, Sugar and Cotton industries we would like to draw your attention to our newly lunched aluminium extrusion company located in Jinja called G Das Industries limited.

    Visit: The Best aluminium Industry

    ReplyDelete
  93. With the vast experience of international market with the reputed Steel, Sugar and Cotton industries we would like to draw your attention to our newly lunched aluminium extrusion company located in Jinja called G Das Industries limited.

    Visit: The Best aluminium Industry

    ReplyDelete
  94. This comment has been removed by the author.

    ReplyDelete
  95. This article was very informative which I enjoyed reading, Thank you.

    Geophysical Equipments
    Geophysical Cable

    ReplyDelete
  96. Useful post , Thank you for sharing this information . keep posting .
    building material suppliers in dubai

    ReplyDelete
  97. This article is very goo and interesting to read, thank you for such information
    New Excellence Canvas Pte Ltd is the foremost trusted Tarpaulin Supplier Singapore. The tarpaulin used for covering and securing items that keep outside. It’s mainly used for outdoor activities like camping or partying. They’re manufactured with water-resistant materials to safeguard furniture from rainwater. Don’t waste your time, visit the company soon.

    ReplyDelete
  98. Thanks for sharing this post with us, Please visit Sivanta to find out the residential properties in Chennai. Sivanta Group is Award Winning Construction Company in Chennai. Click tag to visit our website: Top Construction Company in Chennai | Construction Companies in Chennai | Builders Chennai | Flat Sale in Chennai

    ReplyDelete
  99. Thanks for sharing such an amazing blog. It is really helpful for me and I get my lots of solution with this blog. Thank you for sharing valuable information. Nice post. I enjoyed reading this post…
    Gear Supplier Singapore

    ReplyDelete
  100. Husqvarna 565 Chainsaw - With outstanding cutting performance, the 565 will help you work faster even with long guide bars.

    Visit here:- Garden machinery in ireland

    ReplyDelete
  101. Great Post. Nice Sharing with us. Mitten Vinyl are vinyl cladding suppliers for all of Australia. We supply and install all types of exterior cladding materials. Contact us today +61 1300 665 543 . OR Visit US: https://mittenvinyl.com.au/

    ReplyDelete
  102. This is really good information shared about https://rajnursing.blogspot.com/2018/09/physical-layout-operating-room.html?showComment=1619694823626#c7991412836542379471

    ReplyDelete
  103. Nice post!! I will be looking forward to read more from your end
    Accusure weight machine price

    ReplyDelete

  104. Even after someone finds a handyman they're considering using, they ought to not be afraid to invite references. A contractor with a superb diary should haven't any problem providing contact information for former clients who were pleased with their work. If, for a few reason, they are doing not have references available, try checking with the higher Business Bureau to ascertain if any complaints are filed against them.
    contractors Mobile AL

    ReplyDelete
  105. very nice article, thank you for sharing with us.
    Discover the perfect Gazebo Singapore for your next garden party or event. Built to last and featuring a pop-up design. Mycanvas Connection has a comprehensive range of shapes, sizes, and colors. Our gazebos can be put up and used for shelter within a matter of minutes. For any information about our products and services then get in contact with us today.

    ReplyDelete
  106. very nice article, thank you for sharing with us.
    Discover the perfect Gazebo Singapore for your next garden party or event. Built to last and featuring a pop-up design. Mycanvas Connection has a comprehensive range of shapes, sizes, and colors. Our gazebos can be put up and used for shelter within a matter of minutes. For any information about our products and services then get in contact with us today.

    ReplyDelete
  107. Thanks for sharing this informative post, Elixir is a professional manufacturer and supplier of Roll Forming Sections & Pre-Engineered Buildings of Lightweight and Heavyweight structures and Best aluminium windows company in Hyderabad .The introduction of uPVC windows and doors is a booster for overall safety and health. Our company, Elixir based in Hyderabad understands the unique conditions that a home has to face in harsh climatic conditions. We have developed Pre coated steel windows India designs with the most formidable casings and profiles with quality standards.

    ReplyDelete
  108. Amazing article Post.
    Really this is very useful blog.
    Thanks for sharing with us.
    Want to more details visit us: Deck sheet in Dubai

    ReplyDelete
  109. Thanks for sharing construction update. If you need a property in Pilikothi, Haldwani, Uttarakhand kindly visit 99HaldwaniProperties.com.

    ReplyDelete
  110. A Construction and Drilling Company

    What We Do
    We are a construction company with 30 years experience in vertical and horizontal construction. APRICTC specializes in substation houses and large diameter drilling.
    Working Together
    APRICTC offers an end-to-end client experience that includes seamless communication, budgeting, staffing, on-site organization, and solid, quality handiwork every time.
    Why Choose Us?

    APRICTC believes that transparency, commitment and dedication to our work develops our clients’ confidence in us.

    Our construction company works with experienced engineers, architects, designers and industry experts who are continuously learning to produce beautiful, functional structures. Call us today and bring our project management skills and extensive construction experience to your next project.

    ReplyDelete
  111. This is awesome article thank you
    If you are arranging a special party and event, then provide the chance to Mycanvas Collection help to make your event memorable. The Tentage Supplier Singapore looks forward and provides shade and shelter to such a special event you are planning. Please visit the official website of the firm and get the complete information about the products that they offer to their clients.

    ReplyDelete
  112. Great article, I hope that you will going to post another one.

    Aluminium pergolas Dubai

    ReplyDelete
  113. This is Very helpful blog.
    In this post you can read how to use metal products.
    Thanks for sharing with informative content.
    Get more detail of Sandwich Panel in UAE

    ReplyDelete
  114. Thank you for helping us by providing the information that you had about Modified Lip Lift in Dubai. Your efforts saved us time and helped us learn more about. We appreciate the detail you give to us.

    ReplyDelete
  115. Thank you for helping us by providing the information that you had about Modified Lip Lift in Dubai. Your efforts saved us time and helped us learn more about. We appreciate the detail you give to us.

    ReplyDelete
  116. Nice post, Thanks for sharing your amazing article ! steel structure construction kerala

    ReplyDelete

  117. Globe Panel is a Prominent Name in the field of Shuttering Plywood Manufacturers in India. We offer an inclusive range of Shuttering Plywood in different thicknesses and grades that we manufacture as per international customs and guidelines. Including good bonding strength and fine textures, the range is durable and therefore suitable for both indoor and outdoor application.

    ReplyDelete

  118. Thanks for sharing this informative post, Elixir is a professional manufacturer and supplier of Roll Forming Sections & Pre-Engineered Buildings of Lightweight and Heavyweight structures and Best aluminium windows company in Hyderabad .The introduction of uPVC windows and doors is a booster for overall safety and health.

    Our company, Elixir based in Hyderabad understands the unique conditions that a home has to face in harsh climatic conditions. We have developed Pre coated steel windows India designs with the most formidable casings and profiles with quality standards.

    ReplyDelete
  119. Hey,

    Thanks for sharing such nice information.

    Are you from Canada, Ontario, and searching for the best Roofing Company Cambridge? Here, We are in this business for the last couple of years and we know client satisfaction is a must. Our team members are highly experienced and dedicated to their work.

    Roofing Company Cambridge | Emergency Roofing Services Cambridge | Cambridge Roofing Services | Roof Repair Services Cambridge | Roof Replacement Cambridge | Roofing Contractors Cambridge | Guleph Roofing Company | Guelph Roofing Services

    Please visit our website for pricing details.

    Thanks!

    ReplyDelete
  120. Nice post !! Thanks for sharing such a useful and valuable information. To know more! Concept Materials



    ReplyDelete
  121. Glad to read such an amazing article. Thanks for sharing this great information.
    Quantity Surveyor Sydney

    ReplyDelete
  122. I am really happy to read your blog. It's getting more interest while reading your Blogs. Ladder Manufacturers in Chennai.

    ReplyDelete
  123. Thank you for posting valuable information
    Very helpful blog. keep sharing with us
    Painters near me

    ==================================================================================================================

    Looking for house painter near me


    Looking for painting Contractor


    House painters


    Asian paints provider near me


    Texture Painting


    Painters in jayanagar


    Painter near j.p nagar


    house painting

    ReplyDelete
  124. This article is very nice, thank you for sharing with us.
    MyCanvas Connection is the most trusted Tentage Supplier Singapore. A tentage is one of the most effective products because it has multiples uses within the personal life like campaign, exterior parties, company products promotion, etc. A tentage is durable and also available in numerous shapes, sizes, and colors. Ensure that a tentage is well matched for every type of climate, which means ensuring 100% waterproof with the rain fly that gives total coverage.

    ReplyDelete
  125. The article you have shared here about this topic is really significant for us. I'm happy that you have shared this great info with us. Keep posting, Thank you. Modular Construction in India

    ReplyDelete
  126. This article is very good and interesting to read, thank you for such information.
    Do check this out
    Aluminum Doors Manufacturers in Noida

    ReplyDelete
  127. Amazing piece of content, Thank you for sharing this blog.... Do check this out
    Aluminum Doors Manufacturers in Noida

    ReplyDelete
  128. Read your blog and found it very helpful . Now a days very few are writing excellent content and it was the best i read till now. Keep writing such stuff .

    If you are looking for best aluminum works also then Do check this out
    Aluminum Doors Manufacturers in Noida

    ReplyDelete
  129. The Husqvarna 520iHE3 battery pole hedge trimmer combines petrol performance with zero emissions and extremely quiet operation.

    Visit here:- automower Kildare specifically

    ReplyDelete
  130. Thanks for the Blog!!
    Sachi Design And Build offers many interior designing services that is conducted by top designers. They design your space in exactly the same way as you require. Best Interior Designers In Delhi provides you top interior designing services here.
    Local Construction Company in Delhi NCR
    Commercial Interior Designer in Noida
    Top Construction Company in Delhi NCR
    Civil Construction Company in Delhi

    ReplyDelete
  131. Admiring the dedication you put into your blog and in depth information you provide.
    It’s awesome to come across a blog every once in a while that
    isn’t the same old rehashed information. Fantastic read!
    ci cd security

    ReplyDelete
  132. Read your blog it was amazing. Our company Roof Repairs Quote is the leading Roofing contractor in Sydney that home and business owners trust.
    We are fastest growing roof and roof restoration contractors of Sydney and the most reliable one.
    Let us quote on your job and experience the satisfaction of dealing with us.
    Our small team is resourceful and expert in all things related to new roofing, flashings, guttering, leaf guard and any repair work that is roof related.
    Your Trusted Roofing Contractors.
    Roof Repairs Quote.
    Call Now 0408213175

    Roof Repairs Quote

    ReplyDelete
  133. Read your blog, it was amazing and great to hear from you. Here is our business Perma and we provide the latest technology, deliver unmatched services, training, and offer some of the best solution in the industry for better construction. Over the last decade, our approach to business has helped us transform from a small Construction Chemical upstart Manufacturer and Marketing Company to a leading provider of Construction Solution. This didn’t happen overnight, and it didn’t happen without total commitment to our mission. Helping customers get quality product is our prime motto and we strive to match our products to international standards.
    Do visit our website.

    Perma Construction Aids Private Limited
    Perma Construction Products

    ReplyDelete
  134. Read your blog it was amazing. Our company, City Auto Locksmiths is Sydney’s premier emergency automotive locksmith for years now, We service from Sydney's CBD, South Sydney, Eastern Suburbs, Lower North Shore, Inner West to Sydney’s greater metropolitan region. We offer a wide range of affordable yet professional automotive locksmith services that include working with the latest keyless entry systems, car remotes and transponder keys.
    We specialize in Keyless and Push-Button entry for all makes and models of German Cars including Mercedes lost or spare keys. We can unlock cars brands like Audi, BMW, Jeep, Nissan, Honda, KIA and many more.
    We are Open 24 Hours for any Emergency.

    City Auto Locksmiths.
    Call Now: 0401 786 376

    City Auto Locksmiths
    Lost Car Key Cutting Sydney

    ReplyDelete
  135. Nice blog Thanks for sharing useful information for us. Join No 1 online language learning platform

    ReplyDelete
  136. Great Post. Thank you for sharing with us.
    Need services of pergolas Miami, contact Renu@hand.

    ReplyDelete
  137. Toughned Glass Door Partition Work in ahmedabad
    Upvc Door Window Manufacture in ahmedabad
    False Ceiling Work in ahmedabad
    Aluminium Section Door Window Fabricator in ahmedabad, Upvc Door Window Manufacture in ahmedabad, False Ceiling Work in ahmedabad, Aluminium Section Partition in ahmedabadToughned Glass Door Partition Work Glass Railing or tempered glass is a sort of laminated glass processed by controlled thermal or chemical treatments.Toughned Glass Door Partition Work Glass Railing or tempered glass is a sort of laminated glass processed by controlled thermal or chemical treatments.

    ReplyDelete
  138. Experience the best life with all its comfort, great location and exclusive amenities all at the best price! Terrain Realty Services, offering commercial building and construction services ranging from construction to interior furnishing.https://www.terrainrealty.in/

    ReplyDelete
  139. Thank you for sharing this.
    Manufacturing High Quality Residential & Commercial Doors and Windows, well recognized & reputed by homeowners, renovators, architects and builders. Proudly Australian owned & operated for over 60 years. Call us now at 9602 8773 for an obligation free Quote.
    Aluminium windows in Sydney

    ReplyDelete
  140. This comment has been removed by the author.

    ReplyDelete
  141. Hey, I think your blog might be having browser compatibility issues. When I look at your website in Chrome, it looks fine but when opening in Internet Explorer, it has some overlapping. I just wanted to give you a quick heads up! Other then that, very good blog!
    injection mold China

    ReplyDelete
  142. Nice post, thank you so much for sharing lots of information with us. Keep sharing more post with us.

    scaffolding Haslemere

    ReplyDelete
  143. Thankyou for sharing such a nice article.
    Manufacturing Processes is a specialist business directory comprising of UK engineering companies. To find the UK engineering company for your next project then just click on Precision Engineering Services UK
    the manufacturing process specialism or skill your are needing from the list below:

    ReplyDelete
  144. pergola aluminium
    Pergolaer av aluminium. Sök i alla produkter, märken och återförsäljare av Aluminium Pergolas: upptäck priser, kataloger och nya funktioner. Zenisun Sverige ...

    ReplyDelete
  145. Thanks for sharing such great information about Internal Wall Removal we also write about Internal Wall Removal if you want to read kindly visit below mention site

    Visit: - Internal Wall Removal

    ReplyDelete
  146. Read your blog, it was amazing and great to hear from you. Our business C.B trading Corporation is in the business of Representing and Distribution of a wide range of industrial process products, bringing together some of the most renowed and respected brands i the market since the past five decades.

    Incorporated in 1966, C.B Trading Corporation Started operations with a belief that fast delivery and great customer relations would lead to growth. that formula has proved successful and by remainingg faithful to it year after year, our customers remain faithful to us.

    Do visit our website.
    C. B. TRADING

    ReplyDelete
  147. At Vibecrafts, Customer have a wide range of choice of products that a customer can shop from our huge and exclusive collection of home decor and craft. We provide Décor and Craft Items that suits best to your walls and Home. You can choose different type of décor Items as per your needs and desires, We Sell:
    Ganesha Wall Paintings
    Buddha Wall Paintings
    Living room wall Paintings

    ReplyDelete
  148. Looking for Soundproof Windows

    As the leader in uPVC doors and windows, we at NCL VEKA are always passionate about offering you the best solution in doors and windows. That’s why we are delighted to present our all-new range of accessories that, like our profiles, are perfectly suited for Indian conditions.

    To Know more Click Here : uPVC Window Suppliers

    ReplyDelete
  149. We at Vibecrafts offer amazing Frames with motivational frames for offices that keep you inspired always. Purchase these frames at a suitable price range and place it anywhere you want.

    ReplyDelete
  150. You must first of all check whether the potential contractor is fully insured and licensed. Having an up-to-date license will be of great help as it can enable him to undertake improvements in your present home.

    Ceiling insulation perth

    ReplyDelete
  151. Great blog. Thank you so much for sharing such an informative topic, which will be I think helpful for my business. Yo can also visit Best Cement Dealers Near bhubaneswar for the best results. Thanks a lot.

    ReplyDelete
  152. Read your blog, it was amazing and great to hear from you. Here is our business AB Realty which is a name you can trust to match your choice of lifestyle with the real estate you aspire for. We specialise in primary sale, resale and lease of Premium and luxury homes, corporate spaces, commercial properties, and select retail formats. We are RERA registered, have over 30 years of experience in real estate broking and advisory, transparent and ethical in our work culture and focus mainly on prime locations in South Mumbai.
    With over 30 years of hands-on industry experience, we believe in transparency, ethics and excellence that has not only resulted in satisfied customers but dedicated repeat customers who return to us for more. At AB Realty, we allow our work to speak for us.

    AB Realty
    AB Realty - Our Work

    ReplyDelete
  153. Building Material Wale Is One of Agra's Leading Organized retailers of home improvement and building supplies at best Price Call Now!

    Building Material Dealers in Agra | Aggregate Supplier in Agra | Dust supplier in Hathras | Brick Dealers in Agra
    Shri Ganesh Building Material, Sadabad-281306 (Hathras)
    bmw@buildingmaterialwale.com
    +91-9568697876 +91-7248761170
    https://buildingmaterialwale.com

    ReplyDelete
  154. Cool….i just love learning new things, thanks for the good instruction that i have found here.
    General Steel Doors dealers

    ReplyDelete
  155. Construction Updates: Mivan (Aluminium Formwork) >>>>> Download Now

    >>>>> Download Full

    Construction Updates: Mivan (Aluminium Formwork) >>>>> Download LINK

    >>>>> Download Now

    Construction Updates: Mivan (Aluminium Formwork) >>>>> Download Full

    >>>>> Download LINK mb

    ReplyDelete
  156. Awesome blog. Very easy to read. steel suppliers in Chennai

    ReplyDelete
  157. Excellent post thanks for sharing
    also read: showers

    ReplyDelete
  158. PCB Layout
    If you want to get PCB assembly services in the USA, then PCB Power Market is here to help you. We are the top PCB production company in the USA.

    ReplyDelete
  159. Nice Information, your blog is sharing unique information....
    Thanks for sharing!!

    Kitchen

    ReplyDelete
  160. Very informative post! It has huge information about aluminium frameworks. If you want to know more about aluminium doors and windows then check here Aluminium Doors and Windows

    ReplyDelete